My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> F. Associated Services: Cooperate with agencies performing required tests, inspections, and <br /> similar quality-control services, and provide reasonable auxiliary services as requested. Notify <br /> agency sufficiently in advance of operations to permit assignment of personnel. Provide the <br /> following: <br /> 1. Access to the Work. <br /> 2. Incidental labor and facilities necessary to facilitate tests and inspections. <br /> 3. Adequate quantities of representative samples of materials that require testing and <br /> inspecting. Assist agency in obtaining samples. <br /> 4. Facilities for storage and field curing of test samples. <br /> 5. Delivery of samples to testing agencies. <br /> 6. Preliminary design mix proposed for use for material mixes that require control by testing <br /> agency. <br /> 7. Security and protection for samples and for testing and inspecting equipment at Project <br /> site. <br /> G. Coordination: Coordinate sequence of activities to accommodate required quality-assurance <br /> and -control services with a minimum of delay and to avoid necessity of removing and <br /> replacing construction to accommodate testing and inspecting. <br /> 1. Schedule times for tests, inspections, obtaining samples, and similar activities. <br /> 1.8 SPECIAL TESTS AND INSPECTIONS <br /> A. Special Tests and Inspections: The Owner will engage a qualified testing agency to conduct <br /> special tests and inspections required by authorities having jurisdiction as the responsibility of <br /> the Owner, as indicated in the table of Special Inspection and Testing requirements on <br /> Drawing S-001, and as follows: <br /> B. Special Tests and Inspections: Conducted by a qualified testing agency as required by <br /> authorities having jurisdiction, as indicated in individual Specification Sections, in the table of <br /> Special Inspection and Testing requirements on Drawing S-001, and as follows: <br /> 1. Verifying that manufacturer maintains detailed fabrication and quality-control procedures <br /> and reviews the completeness and adequacy of those procedures to perform the Work. <br /> 2. Notifying the Owner's Representative, Engineer, and Contractor promptly of <br /> irregularities and deficiencies observed in the Work during performance of its services. <br /> 3. Submitting a certified written report of each test, inspection, and similar quality-control <br /> service to the Owner's Representative and Engineer with copy to the Contractor and to <br /> authorities having jurisdiction. <br /> 4. Submitting a final report of special tests and inspections at Substantial Completion, <br /> which includes a list of unresolved deficiencies. <br /> 5. Interpreting tests and inspections and stating in each report whether tested and inspected <br /> work complies with or deviates from the Contract Documents. <br /> 6. Retesting and reinspecting corrected work. <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 014000-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.