My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> PART 2 -PRODUCTS (Not Used) <br /> PART 3 -EXECUTION <br /> 3.1 TEST AND INSPECTION LOG <br /> A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following: <br /> 1. Date test or inspection was conducted. <br /> 2. Description of the Work tested or inspected. <br /> 3. Date test or inspection results were transmitted to the Owner's Representative and <br /> Engineer. <br /> 4. Identification of testing agency or special inspector conducting test or inspection. <br /> B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test and <br /> inspection log for reference by the Engineer and Owner's Representative during normal <br /> working hours. <br /> 3.2 REPAIR AND PROTECTION <br /> A. General: On completion of testing, inspecting, sample taking, and similar services, repair <br /> damaged construction and restore substrates and finishes. <br /> 1. Provide materials and comply with installation requirements specified in other <br /> Specification Sections or matching existing substrates and finishes. Restore patched areas <br /> and extend restoration into adjoining areas with durable seams that are as invisible as <br /> possible. Comply with the Contract Document requirements for cutting and patching in <br /> Section 01 73 00—Execution. <br /> B. Protect construction exposed by or for quality-control service activities. <br /> C. Repair and protection are the Contractor's responsibility, regardless of the assignment of <br /> responsibility for quality-control services. <br /> END OF SECTION 014000 <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 014000- 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.