My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/12/23 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/12/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 9:25:10 AM
Creation date
4/12/2017 9:24:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/23/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> standards identified in the 2002 Mitigation Plan and the years 1 and 2 data to determine the extent to <br /> which the site is meeting or is on target to meet the goals and performance standards. ICF Jones& <br /> Stokes will also recommend any contingency measures that could be taken to improve the functions of <br /> the mitigation site. <br /> ICF Jones&Stokes will submit the draft Year 3 Monitoring Report to EPWD by December 31,2010 with <br /> finalization to occur after client review,but in time for first quarter 2011 submittal to the permitting <br /> agencies as required in the 2002 Mitigation Plan. <br /> Deliverable: WORD document and related figures/appendices of the draft Year 3 Monitoring Report will <br /> be electronically sent to EPWD for review and comment. ICF Jones&Stokes will complete one round of <br /> review and comment on the draft report,with comments from EPWD incorporated in track changes, <br /> and will submit up to 3 bound hard copies and the PDF of the final report to EPWD for their use and <br /> possible distribution to the permitting agencies. ICF Jones&Stokes will not send the report to any <br /> agencies. <br /> Task 9. Project Management Year 3 <br /> The ICF Jones&Stokes project manager will develop and maintain project files,complete monthly <br /> invoicing,maintain telephone and email communication with EPWD's project manager, and will <br /> coordinate with ICF Jones&Stokes staff as necessary to advance the project. This task assumes the <br /> project duration will be 12 months,and anticipates 2 hours of time per month for invoicing, budget <br /> tracking, and internal coordination with ICF Jones&Stokes team and up to 2 hours per month of <br /> coordination with EPWD and/or agency staff at the request of EPWD by the project manager. <br /> Task 10. Adaptive Management <br /> ICF Jones &Stokes will coordinate with Corps staff and/or consultant performing hydraulic modeling <br /> prior to revisions to the hydraulic model. ICF Jones&Stokes will provide digital copies of topographic <br /> data of the restoration site obtained from multiple sources and discuss how to combine the source data <br /> to obtain the most accurate representation of the existing site topography. ICF Jones& Stokes will also <br /> provide continuous water surface elevation measurements collected inside the mitigation site and in <br /> Union Slough during May and June 2009; these measurements are expected to be useful for model <br /> calibration. <br /> After the hydraulic model has been revised to simulate existing conditions and prior to running <br /> proposed conditions in the model,ICF Jones&Stokes will review the ground geometry in the model and <br /> compare that to the site topography/bathymetry to assess how well the ground geometry in the model <br /> simulates the existing site. ICE Jones&Stokes will compare the water surface elevations calculated by <br /> the hydraulic model and compare them to the measured water surface elevations from May-June 2009 <br /> to determine how well the model simulates tidal exchange in the mitigation site. <br /> Year 3 Monitoring Smith Island Restoration 6 J December 7,2009 <br /> 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.