|
BID TABULATION
<br /> BOND STREET CSO FACILITIES-BOND STREET INTERCEPTOR cD'
<br /> W,O.#UP 3f07
<br /> /20 9 I
<br /> } U
<br /> repared By:William Barrett
<br /> For:Heather Griffin,Project Engineer ENGINEER'S ESTIMATE Plats Plus Interwest Construction SCI Infrastructure Taylor's Excavators,Inc,
<br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br /> 6 ITEM DESCRIPTION UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
<br /> 1 Mobilization LS I 5114,583.00 $114,583.00 $66,250.00 $66,250.00 $47,000.00 $47,000.00 $45,000.00 $45,000.00 $48,900.00 $48,900.00
<br /> 2 Traffic Control Labor Hours 540 $75.00 $40,500.00 $35.00 $18,900.00 $42.00 $22,680.00 $45.00 $24,300.00 $45.00 $24,300.00
<br /> 3 Maintenance&Protection of LS 1 $8,000.00 $8,000.00 $10,000.00 $10,000.00 $3,000.00 $3,000.00 $13,000.00 $13,000.00 $4,885.00 $4,885.00
<br /> Traffic Control
<br /> 4 Sawcutting Pavement,Final Joint LF 340 $15.00 $5,100.00 $3.00 $1,020.00 $2.00 $680.00 $6.00 $2,040.00 $5.65 $1,921.00
<br /> Cut,Up to 6 Inch Thickness
<br /> 5 Sawcutting Pavement,Final Joint LF 220 $10.00 $2,200.00 $0.50 $110.00 SI.00 $220.00 $3.00 $660.00 $2.55 $561.00
<br /> Cut,Additional 1 Inch Thickness
<br /> 6 Street Cleaning&Sweeping LS 1 $4,000.00 $4,000.00 $20,000.00 $20,000.00 $3,000.00 $3,000.00 $5,000.00 $5,000.00 $5,500.00 $5,500.00
<br /> 4
<br /> 7 Control Density Fill CY 200 $175.00 $35,000.00 $120.00 524,000.00 $100.00 $20,000.00. $145.00 $29,000.00 $92.15 $18,470.00 i
<br /> 8 HMA Class 1/2"PG 64-22 Ton 150 $150.00 $22,500.00 $91.00 $13,650.00 $100.00 515,000.00 $105.00 $15,750.00 $107.50 $16,125.00
<br /> 9 Concrete Panels SY 1200 $165.00 $198,000.00 $72.00 $86,400.00 $64.00 $76,800.00 $61.75 $74,100.00 $59.90 $71,880.00
<br /> 10 Pavement Patch,Temporary Ton 240 $150.00 $36,000.00 $125.00 $30,000.00 $125.00 $30,000.00 $120.00 $28,800.00 $92.50 $22,200.00
<br /> J
<br /> Crl MH1A,Type 3,72 Inches in LS 1 $30,000.00 $30,000.00 $9,500.00 $9,500.00 $10,000.00 $10,000.00 $13,000.00 $13,000.00 $8,460.00 $8,460.00'
<br /> Diameter
<br /> 12 MH2,Type 3,72 Inches in LS 1 $30,000.00 $30,000.00 $7,000.00 $7,000.00 $10,000.00 $10,000.00 $7,000.00 $7,000.00 $7,310.00 $7,310.00
<br /> Diameter
<br /> 13 MH3,Type 3,72 Inches in LS 1 $30,000.00 $30,000.00 $70,000.00 $70,000.00 $10,000.00 $10,000.00 $6,500.00 $6,500.00 $6,145.00 $6,145.00
<br /> Diameter
<br /> 14 MH4,Type 3,72 Inches in LS 1 $30,000.00 $30,000.00 37,500.00 $7,500.00 $10,000.00 $10,000.00 $8,500.00 $8,500.00 $9,785.00 $9,785.00
<br /> Diameter
<br /> 15 MH5,Type 3,96 Inches in LS 1 $55,000.00 $55,000.00 $17,500.00 $17,500.00 $20,000.00 $20,000.00 $13,000.00 $13,000.00 $17,415.00 $17,415.00
<br /> Diameter
<br /> / 16 Trench Excavation Safety System LS 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $3,500.00 $3,500.00 $35,000.00 $35,000.00 $9,475.00 $9,475.00
<br /> 17 Surveying LS I $6,000.00 $6,000.00 $2,500.00 $2,500.00 $1,000.00 $1,000.00 $3,000.00 $3,000.00 $2,500.00 $2,500.00
<br /> 18 Combined Sewer Pipe,(MHIA to LF 25 5250.00 $6,250.00 $230.00 $5,750.00 $400.00 $10,000.00 $165.00 $4,125.00 $337.20 $8,430.00
<br /> MH1),24-Inch PS-115 PVC
<br />
|