|
•
<br /> BID TABULATION
<br /> BOND STREET CSO FACILITIES-BOND STREET INTERCEPTOR
<br /> W.O.#UP 51107
<br /> Date 12/9/2009
<br /> :brepared By:William Barrett
<br /> For:Heather Griffin,Project Engineer ENGINEER'S ESTIMATE B&L Utility Road Construction Northwest Bidder#23 Bidder#24
<br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br /> 6 ITEM DESCRIPTION UNIT 9UANTrr'1 PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
<br /> 1 Mobilization LS I $114,583.00 $114,583.00 $80,000.00 $80,000.00 $69,000.00 $69,000.00 $0.00 $0.00
<br /> 2 Traffic Control Labor Hours 540 $75.00 $40,500.00 $60.00 $32,400.00 $48.25 $26,055.00 $0.00 $0.00
<br /> 3 Maintenance&Protection of LS I $8,000.00 $8,000.00 $10,000.00 $10,000.00 $57,000.00 $57,000.00 $0.00 $0.00
<br /> Traffic Control
<br /> 4 Sawcutting Pavement,Final Joint LF 340 $15.00 $5,100.00 $6.50 $2,210.00 $2.00 5680.00 $0.00 $0.00
<br /> Cut,Up to 6 Inch Thickness
<br /> 5 Sawcutting Pavement,Final Joint LF 220 $10.00 $2,200.00 $10.00 $2,200.00 $0.30 $66.00 $0.00 $0.00
<br /> Cut,Additional 1 Inch Thickness
<br /> 6 Street Cleaning&Sweeping LS 1 $4,000.00 $4,000.00 $1,000.00 $1,000.00 $7,900.00 $7,900.00 $0.00 $0.00
<br /> •
<br /> 7 Control Density Fill CY 200 $175.00 $35,000.00 $1.00 S200.00 $136.00 $27,200.00 $0.00 $0.00
<br /> 8 HMA Class in,PG6442 Ton 150 $150.00 $22,500.00 S140.00 $21,000.00 $100.00 $15,000.00 $0.00 $0.00
<br /> 9 Concrete Panels SY 1200 $165.00 $198,000.00 $65.00 $78,000.00 $92.25 $110,700.00 $0.00 $0.00
<br /> 10 Pavement Patch,Temporary Ton 240 $150.00 $36,000.00 $1.00 $240.00 $1.00 $240.00 $0.00 $0.00
<br /> CO
<br /> Q`1) MH IA,Type 3,72 Inches in LS 1 $30,000.00 S30,000.00 $8,000.00 $8,000.00 $15,900.00 $15,900.00 $0.00 $0.00
<br /> Diameter
<br /> 12 MH2,Type 3,72 Inches in LS 1 $30,000.00 $30,000.00 $7,600.00 $7,600.00 $12,900.00 $12,900.00 $0.00 $0.00
<br /> Diameter
<br /> 13 MH3,Type 3,72 Inches in LS 1 $30,000.00 $30,000.00 $8,000.00 $8,000.00 $10,850.00 $10,850.00 $0.00 $0.00
<br /> Diameter
<br /> 14 MI-14,Type 3,72 Inches in LS I $30,000.00 $30,000.00 $8,000.00 $8,000.00 $15,750.00 $15,750.00 $0.00 $0.00
<br /> Diameter
<br /> 15 MI-15,Type 3,96 Inches in LS 1 $55,000.00 $55,000.00 $12,000.00 $12,000.00 $28,000.00 $28,000.00 $0.00 $0.00
<br /> Diameter
<br /> 16 Trench Excavation Safety System LS 1 $10,000.00 $10,000.00 $15,000.00 $15,000.00 $6,250.00 $6,250.00 $0.00 $0.00
<br /> 17 Surveying LS 1 $6,000.00 $6,000.00 $2,500.00 $2,500.00 $2,200.00 $2,200.00 $0.00 $0.00!
<br /> 18 Combined Sewer Pipe,(MHIA to LF 25 $250.00 $6,250.00 $400.00 $10,000.00 $335.00 $8,375.00 $0.00 $0.00
<br /> MH1),'24-Inch PS-115 PVC
<br />
|