Laserfiche WebLink
BID TABULATION <br /> Lift Station 5 Force Main <br /> W.O.#UP Z)/00 <br /> Date 12/9/2009 <br /> ' repared By:William Barrett <br /> For:Heather Griffin,Project Engineer ENGINEER'S ESTIMATE Plats Plus Kamins Construction T.E.Briggs Universal Land <br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNrr TOTAL UNIT TOTAL <br /> 6 ITEM DESCRIPTION UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br /> 1 Mobilization LS 1 $40,000.00 $40,000.00 $21,500.00 $21,500.00 $31,380.00 $31,380.00 $30,500.00 $30,500.00 $25,000.00 $25,000.00 <br /> 2 Traffic Control Labor Hours 100 $75.00 $7,500.00 $37.00 $3,700.00 $46.80 $4,680.00 $47.60 $4,760.00 $75,00 $7,500.00 <br /> 3 Maintenance&Protection of LS 1 $7,500.00 $7,500.00 $5,000.00 $5,000.00 $2,400.00 $2,400.00 $4,900.00 $4,900.00 $1,500.00 $1,500.00 <br /> Traffic Control <br /> 4 Sawcutting Pavement,Final Joint LF 400 $5.00 $2,000.00 $0.50 $200.00 $1.50 $600.00 $4.10 $1,640.00 $3.00 $1,200.00 <br /> Cut,Up to 6-Inch Thickness <br /> 5 Sawcutting Pavement,Final Joint LF 400 $0.75 $300.00 $0.50 S200.00 $2.70 $1,080.00 $0.70 $280.00 $2.00 $800.00 <br /> Cut,Additional 1-Inch Thickness <br /> 6 Street Cleaning and Sweeping LS 1 $3,000.00 $3,000.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $2,520.00 $2,520.00 S500.00 $500.00 <br /> 7 Control Density Fill CY 100 $150.00 $15,000.00 $100.00 $10,000.00 $118.56 $11,856.00 $115.00 $11,500.00 $100.00 $10,000.00 <br /> 8 HMA Class l2"PG 64-22 Ton 30 S150.00 $4,500.00 $175.00 55,250.00 $153.60 $4,608.00 $160.00 $4,800.00 $130.00 $3,900.00 <br /> 9 Asphalt Treated Base Ton 60 $120.00 $7,200.00 $140.00 $8,400.00 $147.60 $8,856.00 $131.00 $7,860.00 $120.00 $7,200.00 <br /> 10 Pavement Patch,Temporary Ton 100 5200.00 $20,000.00 $50:00 $5,000.00 $121.80 $12,180.00 $145.00 $14,500.00 SI20.00 $12,000.00 <br /> t <br /> 1'1J Trench Excavation Safety System LS I $20,000.00 $20,000.00 $1.00 $1.00 51,380.00 $1,380.00 $1,054.00 $1,054.00 52,000.00 $2,000,00 <br /> 12 Surveying LS 1 $5,000.00 $5,000.00 $1,800.00 $1,800.00 $3,468.00 $3,468.00 $1,082.00 $1,082.00 $2;000.00 $2,000.00 <br /> 13 Utility Potholing LS 1 $20,000.00 $20,000.00 $1,000.00 $1,000.00 $1,584.00 $1,584.00 $2,800.00 $2,800.00 $3,000.00 $3,000.00 <br /> 14 Combined Sewer Force Main,8- LF 450 S250.00 $112,500.00 $100.00 $45,000.00 $73.04 $32,868.00 $66.50 $29,925.00 $75.00 $33,750.00 <br /> Inch Diameter <br /> 15 8-Inch Flexible Expansion Joint LS 1 $5,000.00 $5,000.00 $6,000.00 $6,000.00 $6,284.20 $6,284.20 $7,390.50 $7,390.50 $5,000.00 $5,000.00 <br /> 16 Lift Station 5 Valves and Piping LS 1 $50,000.00 $50,000.00 $39,000.00 $39,000.00 $21,870.10 $21,870.10 531,000.00 $31,000,00 $35,000.00 $35,000.00 <br /> 17 Pipe Supports LS 1 $10,000.00 $10,000.00 $7,500.00 $7,500.00 $5,377.92 $5,377.92 $9,600.00 $9,600.00 $13,500.00 513,500.00 <br /> 18 Pipe Insulation LS 1 $7,500.00 $7,500.00 $14,000.00 $14,000.00 $8,442.22 $8,442.22 $8,890.00 $8,890.00 $8,000.00 $8,000.00 <br />