BID TABULATION
<br /> Lift Station 5 Force Main
<br /> W.O,#UP 34IOS i„'.
<br /> Date 12/9/2009 m
<br /> Prepared By:William Barrett
<br /> For:Heather Griffin,Project Engineer ENGINEER'S ESTIMATE Plats Plus Kamins Construction T.E.Briggs Universal Land
<br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br /> 6 ITEM DESCRIPTION UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT)
<br /> 19 72-Inch Manhole LS 1 $15,000.00 $15,000.00 $11,500.00 $11,500.00 $8,568.00 $8,568.00 $11,200.00 $11,200.00 $25,000.00 $25,000.00
<br /> 20 Temporary Sedimentation& LS 1 $5,000.00 $5,000.00 $200.00 $200.00 $1,000.80 $1,000.80 $2,220.00 $2,220.00 $750.00 $750.00
<br /> Erosion Control
<br /> 21 Crushed Surfacing Top Course Ton 100 $40.00 $4,000.00 $12.00 $1,200.00 $27.00 $2,700.00 $28.50 $2,850.00 $15.00 $1,500.00
<br /> 22 Crushed Surfacing Base Course Ton 475 $45.00 $21,375.00 $5.00 $2,375.00 S24.21 $11,499.75 $28,50 $13,537.50 $15.00 $7,125.00
<br /> •
<br /> 23 Gravel Borrow Ton 500 $30.00 $15,000.00 $5.00 $2,500.00 $20.51 $10,255.00 $17.70 $8,850.00 $12.00 $6,000.00
<br /> 24 Foundation Material Class A Tort 20 $50.00 $1,000.00 $20.00 $400.00 $20.70 $414.00 $33.05 $661.00 $50.00 $1,000.00
<br /> • 25 Concrete Sidewalk SY 120 $200,00 $24,000.00 $40.00 $4,800.00 $41.40 $4,968.00 $37.00 $4,440.00 $45.00 $5,400.00
<br /> 26 Concrete Curb LF 200 $100.00 $20,000.00 $19.00 $3,800.00 $27.00 $5,400.00 $32.00 $6,400.00 $35.00 $7,000.00
<br /> 27 Curb Ramp EA 1 $2,000.00 $2,000.00 $1,100.00 $1,100.00 $1,140.00 $1,140.00 $1,860.00 $1,860.00 $1,415.00 $1,415.00
<br /> 28 Force Account Work FA 1 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 .$25,000.00
<br /> CD
<br /> M
<br /> Subtotals: $469,375.00 $227,426.00 $231,359.99 $252,020.00 $252,040.00
<br /> WA Sales Tax:9.2% $43,182.50 $20,923.19 $21,285.12 $23,185.84 $23,187.68
<br /> Contract Totals: $512,557.50 $248,349.19 $252,645.11 $275,205.84 $275,227.68