Laserfiche WebLink
BID TABULATION ` <br /> Lift Station 5 Force Main <br /> W.O.#UP 3B <br /> Date 12/9/2009 <br /> R/repared By:William Barrett , <br /> For:Heather Griffin,Project Engineer ENGINEER'S ESTIMATE RL.Alia Construct Company Wiseman Utilities B&L Utility <br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> it ITEM DESCRIPTION UNIT _QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br /> 1Mobilization LS 1 $40,000.00 $40,000.00 $30,000.00 $30,000.00 $33,000.00 $33,000.00 $53,000.00 $53,000.00 $50,000.00 $50,000.00 <br /> 2 Traffic Control Labor Hours 100 $75.00 $7,500.00 $55.00 $5,500.00 $50.00 $5,000.00 $50.00 $5,000.00 $50.00 $5,000.00 <br /> 3 Maintenance&Protection of LS 1 $7,500.00 $7,500.00 $3,000.00 $3,000.00 $7,000.00 $7,000.00 $7,500.00 $7,500.00 $10,000.00 $10,000.00 <br /> Traffic Control <br /> 4 Sawcutting Pavement,Final Joint LF 400 $5.00 $2,000.00 $5,00 $2,000.00 $2.00 $800.00 $7.00 $2,800.00 $5.00 $2,000.00 <br /> Cut,Up to 6-Inch Thickness <br /> 5 Sawcutting Pavement,Final Joint LF 400 $0.75 $300.00 $2.00 $800.00 $4.50 $1,800.00 $8.00 $3,200.00 $5.00 $2,000.00 <br /> Cut,Additional 1-Inch Thickness <br /> 6 Street Cleaning and Sweeping LS 1 $3,000.00 $3,000.00 $1,000.00 $1,000.00 $5,000.00 $5,000.00 $3,700.00 $3,700.00 $1,200.00 $1,200.00. <br /> 7 Control Density Fill CY 100 $150.00 $15,000.00 $10.00 $1,000.00 $90.00 $9,000.00 $150.00 $15,000.00 $15.00 $1,500.00 <br /> 8 HMA Class 1/2"PG 64-22. Ton 30 $150.00 $4,500.00 $300.00 $9,000.00 $135.00 $4,050.00 $209.00 $6,270.00 $200.00 $6,000.00 <br /> 9 Asphalt Treated Base Ton 60 $120.00 $7,200.00 $250.00 $15,000.00 $130.00 $7,800.00 $171.00 $10,260.00 $90.00 $5,400.00 <br /> 10 Pavement Patch,Temporary Ton 100 $200.00 $20,000.00 $25.00 $2,500.00 $100.00 $10,000.00 $150.00 $15,000.00 $50.00 $5,000.00 <br /> ij Trench Excavation Safety System LS 1 $20,000.00 $20,000.00 51,000.00 $1,000.00 $10,000.00 510,000.00 $5,000.00 $5,000.00 $1,000.00 $1,000.00 <br /> 12 Surveying LS 1 $5,000.00 $5,000.00 $500.00 $500.00 $2,000.00 $2,000.00 $1,900.00 $1,900.00 $2,000.00 $2,000.00 <br /> / 13 Utility Potholing LS 1 $20,000.00 $20,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $2,700.00 $2,700.00 $1,300.00 $1,300.00 <br /> 14 Combined Sewer Force Main,8- LF 450 $250.00 $112,500.00 $227.75 $102,487.50 $180.00 $81,000.00 $102.00 $45,900.00 $360.00 $162,000.00 <br /> Inch Diameter <br /> 15 8-Inch Flexible Expansion Joint LS 1 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $5,100.00 $5,100.00 $6,000.00 $6,000.00 <br /> 16 Lift Station 5 Valves and Piping LS 1 $50,000.00. $50,000.00 $48,000.00 $48,000.00 $71,000.00 $71,000.00 $77,500.00 $77,500.00 $75,000.00 $75,000.00 <br /> 17 Pipe Supports LS 1 $10,000.00 $10,000.00 $35,000.00 $35,000.00 $19,000.00 $19,000.00 $24,900.00 $24,900.00 $25,000.00 $25,000.00 <br /> 18 Pipe Insulation LS 1 $7,500.00 $7,500.00 $20,000.00 $20,000.00 $21,000.00 $21,000.00 $16,000.00 $16,000.00 $25,000.00 $25,000.00 <br /> F...% <br />