My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11219 19TH AVE SE WHOLE SITE DEVELOPMENT 2018-08-13
>
Address Records
>
19TH AVE SE
>
11219
>
WHOLE SITE DEVELOPMENT
>
11219 19TH AVE SE WHOLE SITE DEVELOPMENT 2018-08-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 11:31:37 AM
Creation date
4/12/2017 9:50:21 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11219
Tenant Name
WHOLE SITE DEVELOPMENT
Notes
SILVERLAKE CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 3 <br /> 7/28/2015 9:35 <br /> Issued By SJT2 SPOONER,JAMES T. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 5/12/2015 <br /> Fund ao� Account 5 Program ��o Function ��s Activity s�s <br /> Program <br /> Title REPAIR 1 INCH 11219 19TH ST SE 710119675 <br /> Work Order No 20151124 PfOJ2Ct Activity Type CORRECTIVE MAINTENANCE St2tUS CL <br /> St2tUS 5/12/2015 TIf1l@ 16:22 Original WO Bllllllg <br /> Vehicle Costs <br /> Type Vehicle No Description Hours Cost Billing Date Billing Code Warehouse <br /> V J0055 01 FORD 1 1/2 TON SERVICE TRUC 1 9.9 05/11/2015 <br /> V J0043 1999 STERLING 6 YARD DUMP 1 17.1 05/11/2015 <br /> V J0091 2008 FORD 1.5 TON SERVICE TRUC 1 10.3 05/11/2015 <br /> Totai Vehicle Cost $37.30 <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M BOX000155047 BOX METER MOLDED PLASTIC W/DI LID 15"X 27" (MEDIUM) 1 114.429 05/11/2015 PA� <br /> M COUP36145547 COUPLING 1 CTS COMPRESSION X 1 MIP 1.120-1.130 3 51.498 05/11/2015 PA� <br /> M COUP36103447 COUPLING 1 NPT BRASS 1 6.334 05/11/2015 PAP <br /> M ELL036144047 ELBOW 1 NPT 90 DEG STREET BRASS(1/4 BEND) 1 8.161 05/11/2015 PA� <br /> M METE36148347 METER 1 NEPTUNE W/E-CODER R9001 IN CU FT STUB ANTENNA 1 288.448 05/11/2015 PA� <br /> M PIPE36042947 PIPE 1 COPPER TUBE TYPE K ASTM B88 6 19.212 05/11/2015 PAP <br /> M SETT36033547 SETTER COPPER 1 HEIGHT15"LEG LENGTH 15"VI/HO 1 �`-299.069 05/11/2015 PAP <br /> Total Material Cost $787.15 <br /> Personnel Costs <br /> Type ID Name Hours Cost Billing Date Earning Code Class <br /> P AJJ ARCHAMBEAULT,JOHN J. 1 21.908 05/11/2015 <br /> P MHA MAROON,HERBERTA. 1 31.362 05/11/2015 <br /> P WDL WEAVER,DEAN L. 1 32.751 05/11/2015 <br /> Total Personnel Cost $ss.o2 <br /> TOf?I COsf $910.47 <br /> /� : <br /> /� <br />
The URL can be used to link to this page
Your browser does not support the video tag.