My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11219 19TH AVE SE WHOLE SITE DEVELOPMENT 2018-08-13
>
Address Records
>
19TH AVE SE
>
11219
>
WHOLE SITE DEVELOPMENT
>
11219 19TH AVE SE WHOLE SITE DEVELOPMENT 2018-08-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 11:31:37 AM
Creation date
4/12/2017 9:50:21 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11219
Tenant Name
WHOLE SITE DEVELOPMENT
Notes
SILVERLAKE CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT <br /> . , Utilities Division,3200 Cedar Street <br /> F� Everett WA 98201 <br /> 425-257-8800 <br /> • <br /> Receipt # Date Paid 1 �t�;�t �`v <br /> � <br /> X Cost of VVork Order $1405.00 Work Order# ��� �`^�`'�— t,� �'=�- <br /> Cost of Service Order Service Order# <br /> Contact Person NiCk Abdelnour Telephone# 206 786-9817 <br /> Requested By Jim Spooner Date of Request <br /> Property Owner(name) Silver Lake Center, LLC <br /> Charge Cost to(name if different than owner) <br /> Address 11624 SE 5th St, Suite 100 Ciry Bellevue Zip 98005 <br /> Installation Location 11219 19th Ave SE <br /> Installation type/description/size/etc. Move eXlStitlg 1 inch dormant service approx. 8 feet east out <br /> of sidewalk/driveway approach and put in 1 inch setter, meter and box for Irrigation. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor, equipment, <br /> materials, restoration,and final hook-up. <br /> Please notify fhe City of Everett Utilities Division 10 workin�davs in advance of required installation <br /> date to allow for scheduling and parts�rocurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,anaterial,equipment rental and <br /> administrative costs,the deficit shall be charged to the properiy for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> . �Deposit must be paid prior to ordering parts or scheduling work. <br /> �Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 3"AND-L-ARGER-MA-Y-HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $781.00 cc: Bldg.Pernut Center <br /> Mark Sadler <br /> Labor and Benefits $457.00 Matt Welborn <br /> Randy Allen <br /> Equipment Rental $143.00 Paul McKee <br /> Tax $24.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration <br /> TOTAL $1405.00 <br /> Prepared by: Jim Spooner Date Estimate Prepared 4/30/2015 <br /> Accepted by: ,���� Representing <br /> l- ' <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> � <br /> S:\#Common\clerical\Cost.est�2015\ � <br /> 1of1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.