Laserfiche WebLink
CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> U <br /> CONTRACTOR: Corstone Contractors,LLC ADDRESS: PO Box 2280 <br /> CITY: Snohomish STATE: WA 98291 DATE: January 21,2010 <br /> PROJECT TITLE: Swift BRT Northern Terminal WORK ORDER NO. SWIFT-TER-C <br /> DATE WORK COMPLETE: January 8,2010 FINAL AMOUNT: $21,154.52 <br /> • <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned,having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City;I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> understand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> which I may have, arising out of the performance of said contract,which are not set forth in said estimate. <br /> /Mg CORSTONE CONTRACTORS,LLC <br /> X A In X t6/12-z Q_ <br /> CO '`r'CTOR TITLE <br /> NOTARY K• 7-'90� <br /> P a. 4 <br /> Subscribed and sworn to before <br /> me this l day of uULa L tO No.7-A v' m <br /> X Notary Public 1-,,, 3_0'r,2ie <br /> 0 <br /> in and for the State of Washington,residing at aft F)V\rwk, G/ <br /> TRANSPORTATION SERVICES DEPARTMENT CERTIFICATION <br /> I Certify the att.shed final APPROVED Date: l 1-2 —I <br /> estimate to b- ,ased upo actual <br /> measuremeE and to b- ue an• correct. /� <br /> X e._ P -� X 6 <br /> City 'roject Manag- Transporta on ervices Director <br /> George Baxter Thomas Hingson <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> 6 <br />