My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3969
>
Resolutions
>
Resolution 3969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 11:24:03 AM
Creation date
4/13/2017 11:23:56 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3969
Date
7/6/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1995 TO 2000 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 5 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC MINOR ARTERIALS Resolution No. <br /> !F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N I A.PROJECT TITLE p a t e i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> '.. C• o B.STREET/COUNTY ROAD NAME OR NUMBER r T t a n I o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> I r C.TERMINAL BEGINNING AND END o y u I g I d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> N a i N D.DESCRIBE WORK TO BE DONE v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REO. <br /> L s t o .e h y a STARTS Phase UATA 6th Y/N <br /> s y. OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 18 1 A.MADISON STREET IMPROVEMENTS 05 1 C PE 2/93 EIS: <br /> B.MADISON STREET,FAS NO.2780 06 F P R/W 12/94 350 350 300 EMI <br /> C.EAST CADY TO RAINIER DRIVE 12 0 CONST 5/95 Emil DATE: <br /> D.DESIGN AND CONSTRUCTION OF ROADWAY AND SIGNAL IMPS. T TOTAL N/A: <br /> 16 2 A.112TH STREET SE IMPROVEMENTS 04 3.5 C PE 2/93 EIS: <br /> B.112TH STREET SE,FAS NO.2588 08 F P R/W 1/96• --TIA 13800 2200 16000 200 4000 10000 1500 Emil <br /> C.INTERSTATE 5 TO SR 525 12 & 0 CONST 3/97* MIIII DATE: <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING,IMPROVEMENTS S T TOTAL N/A: <br /> 16 3 A.100TH STREET SE IMPROVEMENTS 04 1 C PE 4/94 -_ EIS: <br /> B.100TH STREET SE,FAS NO.2575 06 F P R/W 9/95 TIA 1260 540 1800 250 450 1000 MIN <br /> C.19TH AVENUE SE TO 35TH AVENUE SE 12 0 CONST 6/97 DATE: <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING,IMPROVEMENTS T TOTAL N/A: <br /> 16 4 A.4TH AVENUE WEST IMPROVEMENTS 05 0.5 C PE 9/2000* EIS: <br /> B.4TH AVENUE WEST,FAS NO.2597 06 P P R/W --� 100 1800 100 <br /> C.HARDESON ROAD TO HOLLY DRIVE 12 0 CONST MEE DATE: <br /> D.DESIGN AND CONSTRUCT TURN LANE,CURBS,GUTTERS,SIDEWALKS T TOTAL N/A: <br /> 16 5 A.SEAWAY BLVD.IMPROVEMENTS 05 2 C PE 2/97• EIS: <br /> B.SEAWAY BLVD.,FAS NO.2781 06 P P R/W 9/97* 2000 350 1650 ® <br /> C.75TH STREET TO 36TH STREET 12 0 CONST 5/98* MIIII DATE: <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING,IMPROVEMENTS T TOTAL N/A: <br /> 16 8 A.100TH STREET SW IMPROVEMENTS 04 1 C PE 2/2000* EIS: <br /> B.100TH STREET SW,FAS NO.2584 06 P P R/W _- 200 5000 200 Esai <br /> C.AIRPORT ROAD TO EVERGREEN WAY 12 0 CONST 1331111.DATE: <br /> 0.DESIGN AND CONSTRUCT ROADWAY WIDENING,IMPROVEMENTS T TOTAL -- MEM <br /> - <br /> •A portion or all of the funding for these projects has not yet been committed. <br /> NOTE:'Local Funds'include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.