Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1995 TO 2000 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 4 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC PRINCIPAL ARTERIALS Resolution No. <br /> V P PROJECT IDENTIFICATION -I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N I A.PROJECT TITLE p a t e i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.STREET/COUNTY ROAD NAME OR NUMBER r T t a n I o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.TERMINAL BEGINNING AND END o y u I g I d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> N a i N D.DESCRIBE WORK TO BE DONE v p s t t e PHASE By Code TIA 1 at 2nd 3rd 5th, TYPE REO. <br /> L s t o ,e h y s STARTS Phase UATA 6th Y/N <br /> s y. OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 18 17 18 19 20 21 <br /> - 14 13 A.MUKILTEO BLVD./41ST STREET CORRIDOR AND PEDESTRIAN STUDY 31 00 00 PE 2/96• EIS: <br /> B.MUKILTEO BLVD.,FAS NO.2776 P R/W OTHER 100 100 100 CE: <br /> C.BROADWAY TO DOGWOOD/OLYMPIC CONST EA: DATE: <br /> D.PRELIMINARY URBAN DESIGN STUDY AND ENVIRONMENTAL REVIEW _ _ TOTAL N/A: <br /> 14 14 A.41ST STREET IMPROVEMENTS 04 0.1 C PE 5/97* EIS: <br /> B.41ST STREET,FAS NO.2776 08 P P R/W 8/97* 2000 644 1358 CE: <br /> C.RUCKER TO FRIDAY AVENUE 12 0 CONST 2/98* EA: DATE: <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING,IMPROVEMENTS _T TOTAL N/A: <br /> 14 15 A.ARTERIAL NEEDS STUDY 31 00 00 PE 5/96* EIS: <br />- B.SEAWAY BLVD.,BROADWAY,112TH STREET,ETC. P R/W 250 250 75 75 100 CE: <br /> C.VARIOUS SECTIONS CONST _ EA: DATE: <br /> D.STUDY IMPROVEMENT NEEDS _ TOTAL N/A: <br /> 14 16 A.PAINE FIELD BLVD.EXTENSION AUGN.&ENVIRON.STUDY 31 00 00 PE 6/94 EIS: <br /> B.PAINE FIELD BLVD. F R/W OTHER 444 555 400 CE: <br /> C.SR 526 TO MUKILTEO WATERFRONT CONST EA: DATE: <br /> D.ALIGN.&ENVIRON.STUDY OF JAPANESE GULCH ARTERIAL TOTAL N/A: <br /> 14 17 A.SR 525 HOV LANES 04 2.6 C PE 3/93 EIS: <br /> B.SR 525 08 F P R/W OTHER 9000 2000 11000 3000 4600 2500 CE: <br /> C.SR 99 TO INTERSTATE 5 12 & T CONST 10/95* _ EA: DATE: <br /> D.DESIGN AND CONSTRUCT ARTERIAL HOV LANES(WSDOT) S TOTAL _ N/A: <br /> 14 18 ASR 98 HOV LANES 04 0.6 C PE 3/95 EIS: <br /> B.128TH STREET SE;SR 96 06 F P R/W 4/96 TIA 300 3000 300 800 1900 CE: <br /> C.1-5 TO DUMAS ROAD 12 T CONST 6/97 EA: DATE: <br /> D.DESIGN AND CONSTRUCT ARTERIAL HOV LANES 0 TOTAL N/A: <br /> 14 19 A.SR 99 HOV TREATMENT 06 0.6 C PE 3/97* EIS: <br /> B.SR 99 12 F P R/W 200 1000 1000 CE: <br /> C.SR 526 TO SR 525 T CONST 3/98* _ EA: DATE: <br /> D.DESIGN AND CONSTRUCT ARTERIAL HOV FACILITIES 0 TOTAL N/A: <br /> *A portion or all of the funding for these project phases has not yet been committed. <br /> NOTE:'Local Funds'include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />