Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1995 TO 2000 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 7 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC LOCAL ACCESS Resolution No. <br /> k P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF-07.117.1.71:17— <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N I A.PROJECT TITLE p a t a I C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.STREET/COUNTY ROAD NAME OR NUMBER r T t a n I o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.TERMINAL BEGINNING AND END o y u I g I d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> N a t N D.DESCRIBE WORK TO BE DONE v p a t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o .e h y s STARTS Phase UATA 6th Y/N <br /> s y. OTHE DATE <br /> 1 2 3 4 5 8 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 1 A.ANNUAL STREET OVERLAY PROGRAM 03 00 O PE 3/95 EIS: No <br /> B.VARIOUS STREETS WITHIN THE CITY LIMITS F R/W 2092 2682 405 277 500 1500 CE:X <br /> C.IBID. & CONST 7/95 590 STP(U) EA: DATE: <br /> D.STREET RESURFACING S TOTAL 590 N/A: <br /> 19 2 A.NEIGHBORHOOD MITIGATION SIGNAL PROJECTS 12 00 C PE 3/93 EIS: Yes <br /> B.SEVEN LOCATIONS WITHIN THE CITY LIMITS 08 F T R/W 9/94 53 390 250 CE: <br /> C.IBID. P CONST 3/95 337 CMAQ EA: DATE: <br /> D.DESIGN AND CONSTRUCT PED AND VEHICLE SIGNAL IMPR. TOTAL 337 N/A: 9/94 <br /> 19 3 A.NEIGHBORHOOD TRAFFIC MITIGATION PROJECTS 08 00 C PE 3/92 EIS: <br /> B.VARIOUS LOCATIONS WITHIN THE CITY LIMITS 12 F T R/W 2083 2083 519 519 519 CE: <br /> C.IBID. P CONST 5/93 EA: DATE: <br /> D.INSTALL TRAFFIC CONTROL ENHANCEMENTS IN NEIGHBORHOODS 0 TOTAL N/A:X <br /> 19 4 A.BOEING MITIGATION PARK AND RIDE LOT PROJECTS 06 00 PE EIS: Yes <br /> B.VARIOUS LOCATIONS INSIDE AND OUTSIDE CITY LIMITS 12 F R/W 2/94 180 STP(U) 863 1200 520 200 200 209 CE:X <br /> C.IBID. 21 CONST 5/94 157 STP(U) EA:X DATE: <br /> D.ESTABUSH P/R LOTS TO SERVE SW EVERETT COMMUTERS TOTAL 337 N/A: 2/94 <br /> 19 5 A.PEDESTRIAN IMPROVEMENTS 06 00 00 PE 1/95 EIS: <br /> B.VARIOUS LOCATIONS WITHIN THE CITY OMITS 12 F R/W 300 300 50 50 50 150 <br /> C.IBID. CONST 5/95 EA: DATE: <br /> O.DESIGN AND CONSTRUCT PATHWAYS&CURB RAMPS TOTAL N/A: <br /> 19 8 A.NEIGHBORHOOD BLOCK GRANT PROJECTS 06 00 00 PE 1/95 EIS: <br /> B.VARIOUS LOCATIONS WITHIN THE CITY LIMITS 12 S R/W 360 60 60 60 180 CE: <br /> C.IBID. CONST 5/95 360 OTHER EA: DATE: <br /> D.CONSTRUCT PUBUC IMPROVEMENTS IN NEIGHBORHOODS TOTAL 360 N/A:X <br /> 19 7 A.PAVEMENT MARKING PROJECTS 12 00 00 PE 1/95 EIS: <br /> B.VARIOUS LOCATIONS WITHIN THE CITY LIMITS P R/W 480 480 80 80 80 240 CE: <br /> C.IBID. CONST 5/95 EA: DATE: <br /> D.INSTALL PAVEMENT MARKING IN VARIOUS LOCATIONS TOTAL N/A: 1 <br /> •A portion or all of the funding for these projects has not yet been committed. <br /> NOTE:'Local Funds'Include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />