Laserfiche WebLink
.: � . <br /> SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1995 TO 2000 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date - Pg 8 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC LOCAL ACCESS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T —U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N I A.PROJECT TITLE p a t e i C FEDERAL FUNDIN EXPENDITURE SCHEDULE FUNDED <br /> C C o B.STREET/COUNTY ROAD NAME OR NUMBER r T t a n I o PROJECT MONTH/Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> 1-1 r C.TERMINAL BEGINNING AND END o y u I g I d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> N a i N D.DESCRIBE WORK TO BE DONE v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o .e h y s STARTS Phase UATA 6th Y/N <br /> s y. ONE DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 8 A.EVERETT AVENUE SIGNAL IMPROVEMENTS 12 00 00 PE 1/93 EIS: <br /> B.ROCKEFELLER,OAKES.CEDAR F R/W 600 600 360 CE: <br /> C.EVERETT AVENUE,SR 529 CONST 8/93 EA: DATE: <br /> D.INSTALL SIGNAL IMPROVEMENTS AT EVERETT AVE.SIGNALS TOTAL N/A: <br /> 19 9 A.SIGNAL MASTER&INTERCONNECT 12 00 C PE EIS: <br /> B.VARIOUS LOCATIONS WITHIN NE CITY LIMITS F P R/W CE: <br /> C.IBID. T CONST 5/95 450 450 75 75 75 225 EA: DATE: <br /> D.DESIGN&CONSTRUCT INTERCONNECT;UPGRADE SIG.MASTER TOTAL N/A: <br /> 19 10 A.INTERIM TRAFFIC SIGNALS 12 00 00 PE 1/95 EIS: <br /> B.VARIOUS LOCATIONS WITHIN THE CITY LIMITS F R/W 900 900 150 150 150 450 CE: <br /> C.IBID. CONST 6/95 • EA: DATE: <br /> D.CONSTRUCT INTERIM SIGNALS TOTAL N/A: <br /> 19 11 A.HES SIGNAL IMPROVEMENT 12 00 C PE 3/93 EIS: Yes <br /> B.19TH AVENUE SE AND 110TH STREET SE 14 F P R/W 10 103 20 CE:X <br /> C.IBID. T CONST 10/93 93 STP(S) EA: DATE: <br /> D.SIGNAL IMPROVEMENT PROJECT TOTAL 93 N/A: 2/94 <br /> 19 12 A.DEVELOPER SIGNALS 12 00 C PE EIS: <br /> B.MADISON/EVERGREEN;MERRILL CRK./SEAWAY;CASINO/5TH F P R/W 7000 7000 500 500 3000 3000 CE: <br /> HARDESON/75TH,80TH,MERRILL CREEK PARKWAY;etc. & T CONST 5/94* EA: DATE: <br /> D.CONSTRUCT SIGNALS P TOTAL N/A: <br /> • <br /> 19 13 A.HES PROJECTS 12 F 00 C PE 2/94 EIS: Yes <br /> B.EVERGREEN WAY&S.F.M.DRWY SIGNAL;BROADWAY GUARDRAIL 06 & P RPM 46 464 404 CE:X <br /> SCHOOL SAFETY STY;41ST&S.3RD SIG.;10TH&N.BROAD.INTERSECT. 32 S T CONST 8/94 418 STP(Sr EA: DATE: <br /> D.HAZARD ELIMINATION PROJECTS TOTAL 418 N/A: 11/93 <br /> *A portion or all of the funding for these projects has not yet been committed. <br /> NOTE:'Local Funds"include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />