My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3969
>
Resolutions
>
Resolution 3969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 11:24:03 AM
Creation date
4/13/2017 11:23:56 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3969
Date
7/6/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a,.ra <br /> SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1995 TO 2000 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 9 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC LOCAL ACCESS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N I A.PROJECT TITLE p a t e I C FEDERAL FUNDIN EXPENDITURE SCHEDULE FUNDED <br /> C C o B.STREET/COUNTY ROAD NAME OR NUMBER r T t a n I o PROJECT MONTH/Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.TERMINAL BEGINNING AND END o y u I g i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> N a I N D.DESCRIBE WORK TO BE DONE v p s t t a PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o ,e h y s STARTS Phase UATA 6th Y/N <br /> s y. OTHE DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 14 A.ROADWAY HAZARD EUMINATION 12 00 00 PE EIS: <br /> B.VARIOUS LOCATIONS 06 P R/W 120 120 20 20 20 60 CE: <br /> C.IBID. CONST 5/95* EA: DATE: <br /> D.REMOVE AND/OR MODIFY ROADSIDE HAZARDS TOTAL N/A: <br /> 19 15 A.NEIGHBORHOOD TRAFFIC STUDIES 31 00 00 PE 2/95* EIS: <br /> B.PORT GARDNER,NORTHWEST,AND OTHERS P RAN 70 70 70 CE: <br /> C.IBID. CONST EA: DATE: <br /> D.STUDY TRAFFIC TRENDS,RECOMMEND IMPROVEMENTS TOTAL N/A: <br /> 19 16 A.REGIONAL TRAIL SYSTEM 32 F, 00 PE 3/93 164 CMAQ EIS: Yes <br /> B.HARBORFRONT,RIVERFRONT,INTERURBAN,SILVERLAKE, 12 S, RAN 10/93 341 10430 705 200 200 200 CE:X <br /> BOEING COMMUTER ROUTES,LANGUS LOOP C.VARIOUS LOCATIONS & CONST 3/95 400 SW(U) ,. EA: DATE: <br /> D.DESIGN AND CONSTRUCT PED/BIKE PATHS,BIKE LANES P TOTAL 564 N/A: 10/93 <br /> 19 17 A.COMMUNITY TRAIL SYSTEM 32 F, 00 PE 3/99* EIS: <br /> B.PIDGEON CREEK NOS.1&2,SOUTHEND,SW EVERETT,LOWELL, 12 S, RPM 300 1600 200 CE: <br /> POWDERMILL,NARBECK&MERRILL RING CREEK C.VARIOUS LOCATION & CONST EA: DATE: <br /> 0.DESIGN AND CONSTRUCT PED/BIKE PATHS,BIKE LANES P TOTAL N/A: <br /> 19 18 A.NEIGHBORHOOD TRAIL SYSTEM 32 00 PE 2/95* EIS: <br /> B.VARIOUS LOCATIONS IN EVERETT NEIGHBORHOODS 12 P R/W 5/95* 150 150 25 25 25 75 CE: <br /> C.IBID. CONST 10/95* EA: DATE: <br /> D.DESIGN AND CONSTRUCT PED/BIKE PATHWAYS TOTAL N/A: <br /> 19 19 A.CITY ENTRYWAY LANDSCAPING AND SIGNS 06 00 00 PE 3/95* EIS: <br /> B.VARIOUS ENTRYWAY CORRIDORS W/1N CITY LIMITS 17 P R/W 150 150 25 25 25 75 CE: <br /> C.IBID. CONST 7/95* EA: DATE: <br /> D.SPECIAL LANDSCAPING AND SIGNS FOR CITY'S ENTRYWAYS TOTAL N/A:X <br /> *A portion or all of the funding for these projects has not yet been committed. <br /> NOTE:'Local Funds"Include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.