Laserfiche WebLink
• <br /> SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1995 TO 2000 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 1 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC INTERSTATES AND FREEWAYS Resolution No. <br /> F P PROJECT IDENTIFICATION I S 'T-- U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N I A.PROJECT TITLE p a t e I C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.STREET/COUNTY ROAD NAME OR NUMBER r T t a n 1 o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> TI r C.TERMINAL BEGINNING AND END o y u 19 I d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> N a I N D.DESCRIBE WORK TO BE DONE v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o .e h y s STARTS Phase UATA 6th Y/N <br /> s y. OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 11 1 A.EB SR 526 TO NB INTERSTATE 5 RAMP 08 0.5 0 PE 1/92 819 STP(U) EIS: No <br /> 12 B.INTERSTATE 5,SR 526 04 F R/W TIA 1400 11950 14600 2000 CE:X <br /> C.EB SR 526 AT EVERGREEN TO NB 1-5 AT MP 190 06 CONST 3/94 431 STP(U) _ EA: DATE: <br /> D.DESIGN AND CONSTRUCT NEW RAMP EB SR 526 TO NB IS 12 TOTAL 1250 N/A: <br /> 11 2 A.EB SR 526 TO SB 1-5 HOV LANE 04 3.5 0 PE 9/93 742 CMAQ EIS. No <br /> 12 B.SR 526,INTERSTATE 5 06 F R/W OTHER 350 1050 3800 2500 CE:X <br /> C.EB 526 AT EVERGREEN WAY TO SB I5 AT 128TH STREET SE 12 CONST 6/94 1658 STP(C);STP(U) EA: DATE: <br /> D.DESIGN AND CONSTRUCT HOV LANE FOR P.M.PEAK TRAFFIC TOTAL 2400_ N/A: <br /> 11 3 A.1-5 HOV LANES 05 0.1 0 PE 5/97 EIS: <br /> B.INTERSTATE 5 08 P R/W 8/97* OTHER 50000 50000 25000 CE: <br /> C.164TH STREET S.E.TO SR 528 12 CONST 2/98* _ EA: DATE: <br /> D.DESIGN AND CONSTRUCT MEDIAN HOV LANES TOTAL _ N/A' <br /> 11 4 A.41ST STREET RAMP/INTERCHANGE IMPROVEMENTS 03 0.1 00 PE 5/97* EIS. <br /> • 14 B.41ST STREET,FAS NO.2776 05 P R/W 50 1500 230 1270 CE: <br /> C.BROADWAY TO INTERSTATE 5 10 CONST 2/98* EA: DATE: <br /> D.RAMP IMPROVEMENTS TOTAL <br /> 11 5 A.HOV TREATMENT OF SR 98/15 INTERCHANGE 04 0.2 0 PE 3/94 _ EIS: <br /> 14 B.128TH STREET S.E.AND I-5 06 F R/W OTHER 1600 400 2000 1800 CE' <br /> C.SR 96/1-5 INTERCHANGE 12 CONST 6/95 _ EA: DATE: <br /> D.DESIGN/CONSTRUCT HOV FACILITIES ON RAMPS AND OVERPASS TOTAL N/A: <br /> 11 6 A.INTERCHANGE STUDIES AND IMPROVEMENTS 31 00 00 PE 2/97* EIS• <br /> 12 B.1-5/12TH STREET NE;IS/PACIFIC STREET;SR 526/EVERGREEN WAY;ETC P R/W 500 500 500 CE: <br /> 14 C.VARIOUS INTERCHANGES CONST _ EA: DATE: <br /> D.STUDY,DESIGN,AND CONSTRUCT INTERCHANGE IMPROVEMENTS TOTAL N/A: <br /> *A portion or all of the funding for these project phases has not yet been committed. <br /> NOTE: 'Local Fund?Include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />