My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3969
>
Resolutions
>
Resolution 3969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 11:24:03 AM
Creation date
4/13/2017 11:23:56 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3969
Date
7/6/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> :sats <br /> • <br /> SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1995 TO 2000 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 2 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC PRINCIPAL ARTERIALS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N I A.PROJECT TITLE p a t e i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.STREET/COUNTY ROAD NAME OR NUMBER r T t a n I o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.TERMINAL BEGINNING AND END o y u I g I d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> N a i N D.DESCRIBE WORK TO BE DONE v p a t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o .e h y s STARTS Phase UATA 6th Y/N <br /> s y. <br /> OTHER DATE <br /> 1 2 3 4 5 8 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 14 1 A.PAINE FIELD BLVD./SR 525 CORRIDOR PROJECTS 01 5 C PE 12/91 1027 STP(U) EIS:X Yes <br /> B.PAINE FIELD BLVD.;SR 525 05 F P R/W 5/95 1000 STP(U) TIA 11600 71500 3000 10000 23000 33000 CE: <br /> C.SR 525,BETWEEN SR 528 AND SR 99 06 & 0 CONST 3/96 1000 STP(U) EA: DATE: <br /> D.NEW ALIGNMENT;ROADWAY IMPROVEMENTS;NEW INTERCHANGE 12 S T TOTAL 3027 N/A: 5/95 <br /> 14 2 A.19TH AVENUE SE(SR 527)IMPROVEMENTS 04 1 C PE 1/93 EIS:X Yes <br /> B.19TH AVENUE SE,SR 527 06 F P R/W 9/96* TIA 6584 1218 7800 500 1300 5500 CE: <br /> C.112TH STREET SE TO 132ND STREET SE 12 & 0 CONST 3/97* EA: DATE: <br /> D.DESIGN AND CONSTRUCT ADD.LANES;SIGNAL IMP.,SIDEWALKS S T TOTAL N/A: 6/96 <br /> 14 3 A.EVERGREEN WAY IMPROVEMENTS 04 0.5 C PE 1/94 68 STP(U) EIS: Yes <br /> B.EVERGREEN WAY,FAS NO.2791 06 F P R/W 11/94 35 STP(U) UATA 476 121 665 597 CE:X <br /> C.75TH STREET TO SR 528 12 0 CONST 5/95 EA: DATE: <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES T TOTAL 103 " N/A: 11/94 <br /> 14 4 A.EVERGREEN WAY IMPROVEMENTS 04 0.5 C PE 1/94 111 STP(U) EIS: Yes <br /> B.EVERGREEN WAY,FAS NO.2791 06 F P R/W 11/94 250 STP(U) 809 1170 1059 CE:X <br /> C.MADISON STREET TO 75TH STREET 12 & 0 CONST 5/95• EA: DATE: <br /> D.DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES P T TOTAL 361 N/A: 11/94 <br /> 14 5 A.WEST MARINE VIEW DRIVE IMPROVEMENTS 05 0.8 C PE 2/95 EIS: <br /> B.WEST MARINE VIEW DRIVE,SR 529 06 S P R/W 7/95• TIA& 1258 738 1996 400 1596 CE: <br /> C.10TH STREET TO 18TH STREET 12 0 CONST 3/96* OTHER EA: DATE: <br /> D.DESIGN AND CONSTRUCT CONT.TURN LANE;SIDEWALK;SIGNAL T TOTAL N/A:X <br /> 14 6 A.EVERGREEN WAY/CASINO RD IMPROVEMENT 04 0.1 C PE 1/94 EIS: <br /> B.EVERGREEN WAY,FAS NO.2791 11 F P RPM -- 400 400 375 CE: <br /> C.EVERGREEN WAY FROM SR 526 TO FRED MEYER 12 T CONST 8/95 EA: DATE: <br /> D.DESIGN AND CONSTRUCT INTERSECTION,ROADWAY IMPROVEMENTS TOTAL N/A: <br /> •A portion or all of the funding for these project phases has not yet been committed. <br /> NOTE: 'Local Funds'include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.