Laserfiche WebLink
7. Special charges for connection to the sewer and water systems in accordance with <br /> Ordinence :1 I1-85 and subsequent revision are applicable. These chazgea are besed <br /> on projected water usage and can be substential, Applicant is encouraged to obtein a <br /> copy of the Ordinance and determine estimeted charges prior to building permit <br /> application. The actual cherges shall be computed ��y tho Public Works Department <br /> per the ordinence in effect at the time and according to the information on the <br /> npproved plans at the time of building permit issuance. <br /> 8. Leck o.`ccmment on the plans submitted with the application does not constitute <br /> approvel of these plens. <br /> 9. A fire hydrant is required within 200 driving feet but not closer than 50 feet of every <br /> st:ucture. <br /> 10. City streets and alleys are to be kept clear of dirt and debris et al! times during <br /> conslruction. nust suppression end street cleaning must occur as directed by the <br /> Public Works Inspector. <br /> I I. A Performance Guarantee is required for street improvements on 7'" Avenue SE and <br /> on 100'" Street SE prior to any building pertnit bcing issued. I <br /> 12. A one year wartanty is required on the public improveme�ds for an araount not less <br /> than 10%of the cost of construction end sh. .'I run for one year from the dete of final <br /> approvnl/issuance of the first Occupancy Pe�mit. <br />