Laserfiche WebLink
BUIL�ING PERMIT �NFORMATION ' <br /> COOES IN EFFECT � <br /> I <br /> UBC 1?88 <br /> UMC 1988 <br /> UPC 1988 ' <br /> NEC 1987 <br /> ADMINISTRATIVE <br /> Plan Reviews - become void if the permit is not issued within 180 days. <br /> Permits - become void if constructicn is not started within 180 deys or <br /> construction ceases for 180 days. <br /> Special Inspection - may be required on certain phases oP some <br /> constructinn. This will be noted on your approved plans. pualified <br /> persons must be employed by the owner to provide additional inspection <br /> services. <br /> Required Inspectians: <br /> Building Foun�lation <br /> � Frame <br /> CertiPicate oP Insulation <br /> Jrywall Nailing <br /> FSnal <br /> Mech/Plmb Ground <br /> Rough-In <br /> Final <br /> Gas Pi��ing <br /> Electric Temporary Power <br /> Rough In (Service) <br /> Final <br /> Repeated reinspections Por identical corrections require a reinspection <br /> fee. <br /> Certificates of Occiipancy (i�sued for Commercial Buildings) - require <br /> 8uilding Division, Public Works, Planning and Fire approval.. <br />