Laserfiche WebLink
B. SWPPP Minimum Elements <br /> 1 Preserve Vegetation and Mark Clearing Limits <br /> The first step in the construction process is for the contractor to fence the limits of <br /> cleanngldisturbance (BMP C103) prior to any uther construc6on activity The engineenng <br /> plans locate and provide the square (ootages for the areas of grading. clearing, impervious <br /> surfaces and un-disturbed areas on the proposed sde As much of ihe natural vegetation <br /> as possible will be pre�erved on this pro�ect (BMP C101) Approximately 100"/0 of the <br /> entire site will be cleared or disturbed for this pro�ect <br /> 2 Estabhsh Consiruction Access <br /> The SWPPP calls for ihe proposed construction entrance (BMP C105) to be installed as <br /> ihe second step after the staking of clearing limits Since this pro�ect will utilize the <br /> existing sde access on the property this feature will not require any excessive grading to <br /> �nstall, will be available immediately and may require some maintenance to ensure proper <br /> function during the site work A1 this fime winter work is expected dunng ihe wet season <br /> 3. Conirol Flow Rates <br /> Th�s pro�ect is below the thresholds requinng flow control fo! ihe pro�ect. <br /> 4 Install Sediment Controls <br /> This site SWPPP proposes to construcUmaintain a gravel entrance (BMP C105). <br /> vegetative buffer (BMP C102), silt tencing (BMP C233) and retention of the existing <br /> vegetat�on (BMP C 101� thal will provide a vegelated stnp around the work area and any <br /> ad�acent property line The construction of ihese features should be completed be(ere the <br /> cleanng and grading of the sde Mulch (BMP C121) wdl also be used on the exposed soil <br /> as necessary to hmit erosion In addi�ion, streels shall be cleaned as needed at the end oi <br /> each work day or through out the day rf diit and debris is tracked onto ihe paved surfaced. <br /> 5 Stabilize Soils <br /> The "Construction Sequence" calls for the stabilizatlon of soils that remam unworked for <br /> certain lengths of time based on the time o( year. Bare/disturbed soils shall remain <br /> uncovered or un-stabiLzed for no more than 2 days from Oct. 1 - April 30 and no more <br /> than 7 days from May 1 - Sept 30. 5tabilization techniques may include but not limited <br /> to mulchmg (BMP C121), plastic sheeting (BMP C123) or hydroseeding (BMP C120�, <br /> notes have been added to the plan regarding protection for ihe stock pile area if <br /> necessary A stockptle area has been idenGfied on the SWPPP and is setback a minimum <br /> of 25-feet from any down slope property Ime In adddion dunng dry penods soil should be <br /> cuvered or wetted (BMP C140) to reduc.: the production of dust <br /> 6 Protect Slopes <br /> All disturbed slopes on site dunng construction are re�wred to be protected with mulch <br /> (BMP C121) or other means as spenfied in the construction sequence hke suriace <br /> roughenir�g (BMP C130) No concentrated runoff or significar�t amounts of sheet flow wdl <br /> be directed to new cut or fill slopes during consiruction (BMP C206) <br /> 7 Protect Drain Inlets <br /> The runoff (rom this pro�ect to the west withm the R O W. will pass over a vegetated <br /> shoulder/swale before being collected by an existing CB This will prov�de the necessary <br /> protec6on of ihe downstream system from sediment laden runoff Siit socks may be added <br /> to the downstream CB d needed dunng construction <br /> Adau 100'r, I o1 7 SFR 12-12U5-7 �(� <br /> De;: 2012 Page � �� � � . <br /> \/�+ <br /> I <br />