My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1502 100TH ST SW 2016-01-01 MF Import
>
Address Records
>
100TH ST SW
>
1502
>
1502 100TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 10:07:17 AM
Creation date
4/14/2017 10:07:03 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1502
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 Stabdize Channels and Outlets <br /> No new channels or outlets are proposed for this site except for the splash hlocks and <br /> transition zone which w�ll not create a concentrated flow conddion <br /> 9 Control Pollutants <br /> No outside chemicals are expected ro be necessary for the censtruchon o( this pro�ect All <br /> vehicles working on and around the site would need to meet the State requirements for <br /> emissions. <br /> 10. Control DeWatenng <br /> DeWatenng may be necessary for this pro�ect However, the existmg vegetation retamed <br /> on s�te would be available to spread any water from construction for filtraUon and disposal. <br /> 11 Maintain BMPs <br /> The construction supervisor wdl be responsible for maintalrnng all BMPs dunng <br /> construction and working with the City to relocate or add BMPs as necessary as site <br /> condit�ons change BMPs should be inspeded and maintained as needed after every rain <br /> event producing more than Y." of rain m a 24-hour penod Also, BMPs shall be mspected <br /> on a weekly basis even rf sde work is not occurnng <br /> 12 Manage the Pro�ect <br /> It will be the responsibility of the Contractor and Developer to manage this pro�ect and <br /> coordinate with the City Inspector and Engineer <br /> Inspection and Moniloring <br /> Site inspections shall be done by a person who is knowledgeable m ihe prmaples and <br /> practices of erosion and sediment control The person must have skdls to first assess the <br /> site conditions and construction activities that could impact the quality of �,tormwater and <br /> second assess the eHectweness of erosion and sediment control measures used to <br /> control ihe quality of stormwater discharges <br /> Whenever inspection and/or morntonr�g reveals thaf the BMPs �dentded in the <br /> Constructwn SWPPP are madequate, due to the actual discharge oi or poten6al lo <br /> discharge a significar,t amount o( any pollutant, appropriate BMPs or design changes shall <br /> be implemented as soon as possible <br /> Maintaining an Updated Consiruction SWPPP <br /> The construction SWPPP shall be retamed on-sile or w�ihin reasonable access to the srte <br /> The SWPPP shall be modified whenever there is a change in the des�gn. construction, <br /> operation, or maintenanCe at the consiruction sde ihat has, or could have, a signi(icant <br /> efiect on the discharge of pollutants to waters of Ihe s�ate <br /> The SWPPP shall be moddied d, dunng inspections or investigations conducted by the <br /> ownerloper3lor, or the applicable local or state regulalory authonty, it is determmed that <br /> the SWPPP is inefledive in ehminating or signd�cantly mirnmizmg pollutants m stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include <br /> addiUonal or moddied BMPs designed to correct problems identified Revislons lo ihe <br /> SWPPP shall be completed within seven days following mspection <br /> AAau 1001°Lo1 7 SFR 12-12057 �� <br /> Dec ?012 Page A �/ i: <br /> � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.