My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1508 100TH ST SW 2018-01-02 MF Import
>
Address Records
>
100TH ST SW
>
1508
>
1508 100TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 2:44:49 PM
Creation date
4/14/2017 10:11:58 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1508
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. SWPPP Minimum Elements <br /> 1. Preserve Vegetation and Mark Clearing Limits <br /> The first step in ihe construction process is for the contractor to fence the limits oi <br /> clearingldisturbance (BMP C103) prior to any other construction activity. The engineering <br /> plans lucat= and provide the square footages for the areas oi grading. clearing, impervious <br /> suriaces and un-disturbed areas on the proposed site. As much of the natural vegetation <br /> as possible will be presPrved on this project (BMP C101). Approximately 100% of the <br /> entire site will be cleared or disturbed for this projecl <br /> 2 Establish Construction Access <br /> The SWPPP calls for the proposed construcUon entrance (BMP C105) to be installed as <br /> the second step after the staking of clearing limits Since this project will utilize the <br /> existing site access on the property this (eature will not require any excessive grading to <br /> install, will be available imrnediately and may require some maintenance to ensure proper <br /> funclion during the site work. At this time winter work is expected during the ��et season. <br /> 3: Control Flow Rates <br /> This project is beiow ihe thresholds requiring flow control for the project. <br /> 4 Install Sedimenl Controls <br /> This site SWPPP Proposes to construcUmaintain a gravel entrance (BMP C105), <br /> vegetative bufier (BMP C102), silt fencing (BMP C233) and retention of the existing <br /> vegetation (BMP C101)that will provide a vegetated strip around the work area and any <br /> adjacent property line. The con+>truclion of these features should be compieted before the <br /> clearing and grading of the site Mulch (BMP C121) will also be used on the exposed soil <br /> as necessary to limit erosion. �n addition, streets shall be cleaned as needed at lhe end oi <br /> each work day or through out the day i( dirt and debris is tracked onto the paved surfaced. <br /> 5 Stabihze Soils <br /> The "Construction Sequence" calls tor the stahilization of soils that remain unworked for <br /> certain lenglhs of time based on the time of yeac Bare/disturbed soils shall remain <br /> uncovered or un-stabilized for no more than 2 days from Oct 1 —April 30 and no more <br /> than 7 days from May 1 — Sept. 30. Stabilization lechniques may include but not limited <br /> to mulching (BMP C121), plastic sheeting (BMP C123) or hydroseeding (BMP C120), <br /> notes have been added to the plan regarding protection for the stock pile area if <br /> necessary. A stockpile area has been identified on the SWPPP and is setback a minimum <br /> of 25-feet from any down slope property line In addition, during dry periods soii should be <br /> covered or wetted (BMP C140) to reduce the production of dust. <br /> G Protect Slopes <br /> All disWrbed slopes on site during construction are required to he protected wilh mulch <br /> �BMP C121) or other means as specified in the construction sequence like surface <br /> rougheniny (BMP C130) No concentrated runoH or significant amounts o` sheet ilow will <br /> be dirPcled to new cut or fill slopes during construction (BMP C206). <br /> 7 Protect Drain Inlets <br /> The runoff from this project to the west within the R O.VV. will pass over a vegetoted <br /> shouider/swale before being collected by an existing CB. This will provide the necessary <br /> proteclion ot the downstream system from sediment laden runoH. Silt socks may be added <br /> to the downstream CB i( needed during consiruction <br /> AAah 100°� Lot 10 SFR 12-1205�10 � <br /> Uec 20t2 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.