Laserfiche WebLink
8 Slabilize Channels and Outlets <br /> No new channels or outlets are proposed for this site except for the splash blocks and <br /> transition zone which will not create a concentrated flow condition. <br /> 9 Control Pollutants <br /> No outside chemicals are expected to be necessary for the construction of this project. All <br /> vehicles working on and around the site would need to meet the State requirements for <br /> emissions. <br /> 10; Control DeWatering <br /> DeWatering may be necessary for this project. However, the existing vegetation retained <br /> on site would be available lo spread any water trom construction for 6{tration and dsposal. <br /> 11: Maintain dMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during <br /> construction and working with the City to relocate or add BMPs as necessary as site <br /> conditions change, BMPs shouid be inspecled and maintained as needed after every rain <br /> event producing more than Y+" of rain in a 24�hour period. Also, BMPs shall be inspected <br /> on a weekly basis even if site work is not oc:urring. <br /> 12. Manage the Pro�ect <br /> It �vill be the responsibility of the Contrector and Developer to manage this project and <br /> coordinate with the City Inspector and Engineer. <br /> Inspection and Monitoring, <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion ar.d sediment conlrol The person must have skiils to first assess the <br /> s�te conditions and construction activities that could impact the quality of slormwater, and <br /> second assess the eHectiveness of erosion and sediment control measures used lo <br /> controi ;he qualily ot stormwater discharges. <br /> Wh��ever inspectiori andlor monitoring reveals thal the BMPs identified in the <br /> Constru�tiun SWPPP are inadequ2te, due lo the actual discharge of or potential to <br /> dischar �e a signi(icant amount of any pollutant. appropnate BMPs or design changes shall <br /> be impLmeMed as soon as possible. <br /> Maintainmg an Updated Construction SWPPP, <br /> The construction SWPPP shall be retained on-site or wilhin reasonable access to the site <br /> The SWPPP shall be modified whenever lhere is a change in lhe design, construction, <br /> operation, or maintenance at the construction site that has, or could have, a significant <br /> effect on lhe discharge of poilutants to waters of the slate. <br /> The SWPPP shall be modified if, during inspections or investigations conducted by the <br /> ownerloperator, or ihe applicable local or state regulatory authority, it is determined that <br /> the SWPPP is ineffective in ehmmating or significantly minimizing pollutants in stormwater <br /> discharges from the site The SWPPP shall be modified as necessary to include <br /> additional or modified BMPs designed to correct problems identified Revisions to the <br /> SWFPP shall be cornpleted wdhin seven days following inspection <br /> �d�nr 1�11)� I n1 10 '.;! f� 12-1205�10 / � , <br /> I u•,: 7U 17 Page B <br />