My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 103RD PL SE 2016-01-01 MF Import
>
Address Records
>
103RD PL SE
>
505
>
505 103RD PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 2:45:43 AM
Creation date
4/14/2017 11:06:41 AM
Metadata
Fields
Template:
Address Document
Street Name
103RD PL SE
Street Number
505
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />M <br />M <br />M <br />M <br />M <br />M <br />� <br />r_ � <br />r- <br />� <br />� <br />� <br />�� CASCADE GEOTECHNICAL, INC. <br />`' R911 N E 126TH PLACE Q061821�5080 <br />KIRY.IAND.WASNINGTON98034 FAXQ0618I3�iI03 <br />March 27, 1991 <br />Job No. 9102-18G <br />Tha December PArtnership <br />22702 66th Avenue W. <br />Mountlake Tarrace, Waehington 98107 <br />Attention: Mike Garland <br />Reference: Preliminary Soils Study <br />December Partners Site <br />103rd P1. S.E. @ 7th Ave. S.E. <br />Everett, washington <br />Pruject ,�90-26-161 <br />Dear Mr. Garland: <br />As requested, we have conducted a subsurface soils investiqation <br />for the above site. The following report summarizes our field <br />ob4ervations and provides preliminary conclusions and <br />recommendations. <br />SCOPE <br />The scope of our study was to investiqate the subsurface Roil and <br />ground water conditiona at the site with backhoe test pits and two <br />(2) twenty-four (24) foot test borinqs, review the information in <br />our files on the site and surroundinq area, and to prepare a <br />preliminary geotechnical report. Th1s report addresses the <br />subsurface soil a�nd ground water conditions, and provides <br />preliminary recommv:ndations for foundation desiqn parameters, <br />erosion control, slab-on-grade floors, and drainage for the project <br />as we now understand it. <br />PROJECT DEBCRZPTION <br />At the time of our visit, we were provided with a topoqraphic map <br />
The URL can be used to link to this page
Your browser does not support the video tag.