Laserfiche WebLink
� <br />Eeer`y <br />1. The R-19 floor insulation ahould be ahown in Secdon 1/7. The attschmern method <br />BhOUId �G CISf1i�Gd. <br />2. The batt insulation inats:��,i aver the slab-on-�rade should be rcviaed to a closed�ell <br />foam type to limit darnag� due to condensation or other trapped moianue. <br />i„_��i!'�tl <br />1. Combustlon air aupply should be provided for the gas furnece. The method oF <br />providing and amount of the air should be shown on the plans. Sxtion 70'�.4 & 706, <br />UMC <br />�3tructunl <br />1. The maximum allowab(e ehear for SW2 should be shown as 175 PLF, revised <br />calculationa should be provided. Footnotc 1, Table 25-I <br />2. It sho��ld be shown how the roof diaphragm wiil transfer ahear forces to the interior <br />shear walls. <br />Prepare a response letter ahowing wlere each item in this correction letter is addressed <br />on the plen set. <br />Upon submittal of the drawings, your epplicetion will be given prioriry a� plan review <br />will recommence. . <br />All required submittals shell be of sufficient deteil and contain sufficient information to <br />ensure that the proposed swcture will be constructed in compliance with all edopted <br />codes. <br />Sirrcerely, <br />��� <br />Assceiate Engineer <br />�54::1.'dIJs1 <br />�� <br />