My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1327 112TH ST SE RUSSIAN BAKERY 2016-01-01 MF Import
>
Address Records
>
112TH ST SE
>
1327
>
RUSSIAN BAKERY
>
1327 112TH ST SE RUSSIAN BAKERY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 6:42:47 PM
Creation date
4/14/2017 6:42:40 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
1327
Tenant Name
RUSSIAN BAKERY
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!�� ENVIRONMENTAL HEALTH DNISION <br /> �•L'� SNOHOMISH 30?G Rucker Avenue. Sinto '�.: <br /> HEALTH Everet�. Wn (�fi?Dt�390� <br /> ��I DISTRICT 4:�5.'39.5:5� FAX' 425.33q 5?.`,•: <br /> Deaf/Hard of Heanng: 425.::?;, '.,:'S^ "'�' <br /> -------- , � �U��I a'-� <br /> � �� ,: <br /> , <br /> �;:,� �'�� <br /> � �' � -�',( � r�lri'� <br /> September 2L 2011 � ' <br /> �,U��EP �� 1011 ���� <br /> �< <�'�)1Zk,S <br /> Roman Avramenko <br /> 11326 41" Dr SE <br /> Everett,WA 96208 <br /> Sub�ecY Proposed Piroshky t�nd Crepes 132i 112°' St 5E. Everett <br /> Dear Mr Avramenko. <br /> Your rew5ed plans and information submitted August 26, 2011 have been received. however the plans <br /> cannot be approved as submitter' The tollowing iniormation is needed prior to fuAher plan review <br /> 1 Your written response to item #1 of the plan disapproval lelter oi August 11, 2011 indicates ihat <br /> borscht will be cooled untii cold and will be placed m the reirigerator, then reheated per customer <br /> order Per the letter of August 11. 2011. no cooling of foods is allowed without the installation of a <br /> walk-in re(rigerabr or blast chiller No walk-m refngerator or blast chiller is mcluded on the tloer plan <br /> n�Cu dedaoln the floor plan'oe equUipmennta s�tl Beciause obth s cnolc oi ng oi food wde ber allowed at this <br /> (acility Unless proper equipment for cooling of the borscht is provided, the borscht must be made <br /> each day and hot held for s2me day service Leftover borscht musl be discarded. <br /> 2 Hard boiled eggs (or the smoked fish filling and cooking oi a mushroom filling are indicated on the <br /> revised HACCP Because proper cooling equipment is not being provided for this estabhshment. no <br /> cooking and cooling oi hard boiled eggs or rc�ushroom fillings will be allowed The eggs must be <br /> purchased Fre-hardboiled from a supplier The mushroom filling must be must be hot held aiter <br /> cooking <br /> 3 Due to lhe proposed eqwpment locations. the location of lhe handwash sink (item #7) does not <br /> provide proper access to all areas oi the estabhshment A handwash sink is required fo� the food <br /> preparation sinklware washing area. A handwash sink is also required for the cook linelfood <br /> ureparalionf(ront counter area The location o(these handwash smks must be shown on the tloor plan <br /> 4 Nc specification sheet was submitted for the stainless steel counter (item #3A) The specificaLon <br /> sheet for lhis equipment must be submitted <br /> ;5 The dishwasher �item #3) is located next to the stainless steel counter (item it3A) Dish�rashers are <br /> required have a pre-nnse sink with spray arm or be installed directly next lo the three-compartment <br /> p ovidedhnextatolthe dishwashe� orllhe dishwasher moved nexrt to the three-ctompartment�snkSThe <br /> pre-nnse sink or the relocated dishwasher must be shown on the iloor plan Because the proposed <br /> dishwasher is an under counter unit, it is highly recommended that the dishwasher be installed under <br /> the dirty dish dramboard of the ihree-compartment sink <br /> C t oo aplan A sandw�P�pr paration eei�rigeratoN s eq tlredhTh sPwas also noe d�in ihe planud sapproval <br /> letter of August 11. 2011, item tt18 <br /> 7 The specification sheet (or the food preparation sink (item #5) shows a sink �ithoul a drainboard. Food <br /> preparation smks are required to have at least one mtegral drainboard The revised tloor plan includes <br /> ,� (ood preparat�on smk with dramboard An updated specitication sheet tor this sink that includes the <br /> i���uired d�a�nbcard must be sub�nitled <br />
The URL can be used to link to this page
Your browser does not support the video tag.