My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1505 112TH ST SW 2018-01-02 MF Import
>
Address Records
>
112TH ST SW
>
1505
>
1505 112TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 9:32:12 AM
Creation date
4/14/2017 8:04:26 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SW
Street Number
1505
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ale The structure that releases flows into the biofiltration <br />^-0'1",I Swale should have a capped riser, with a 1 inch vent hole, <br />dt y� that extends G inches above the elevation of the direct <br />_s r * wetland overflow. <br />, <br />Oil/water separators <br />The inlet and outlet el.ivations of the separator, the <br />elevation of the bottom of the separator, and the position <br />and height of interior baffles should be clearly shown on <br />the vault detail. <br />The separator should be equipped with a sampling tee at its <br />l�yl i eF.2outlet. <br />i <br />L Downstream conditions must not result in water being backed <br />up into the oil/water separator. The maximum elevation of <br />water downstream should be a minimum of one foot below the <br />invert elevation of the outlet pipe. <br />The oil/water separator maintenance notes from section <br />4.11.1 of the City of Everett Design and Construction <br />Standards and Specifications must be included on the plans. <br />PI-M M)CTiFS•1sQ1 <br />,'eS e? „11 rockeries or retaining walls greater than 4 feet high <br />j^d must be structurally designed and the structural design must <br />& rd ` be submitted to the City for review by the City's structural <br />as , a� engineer. <br />VIP <br />a, When perforated pipe is called out, the type of pipe, size <br />7 my of perforations and spacing of perforations must be called <br />out. <br />U/s•I. C`,,P It is important to leave enough horizontal room for <br />•L y," ' s construction of the rockeries. City of Everett inspectors <br />•�W ry a F` indicate that 4 feet or more is typically necessary. The <br />y^M1" �'.,✓ eS plans need to show this distance to demonstrate that the <br />4' CICC ":I`designed facilities will actually fit into the space <br />P twe",l provided. <br />at' *U <br />�.w The silt fence provided for erosion control around the edge <br />of the wetland should be placed at the edge of the wetland <br />buffer in all areas where grading is not occurring within <br />the buffer area. <br />r- The invert elevation of the pipe to be located at the outlet <br />*set � of the wetland must be approved by the City's environmental <br />r (14 , / planner. <br />P.ye OIAV <br />A+ <br />
The URL can be used to link to this page
Your browser does not support the video tag.