Laserfiche WebLink
PLAN REVIEN �ONNENTB <br />Vegetated swalest <br />XRip-rap should be provided at the inlet to the swale. <br />C'^ P A The biofiltration swale note on sheet C1.2 should specify <br />5),o Z 3:1 maximum side slopes. <br />� The following note should be added on the page with the <br />biofiltration swale cross -sectional details: <br />NOTE: the specified biofiltration seed mix is not a <br />standard mix and will need to be specially ordered. Allow <br />7-4 weeks for delivery of the mix. If problems are <br />_ <br />encountered in obtaining a mix meeting the City's <br />specifications, please contact Jane Zimmerman, City of <br />Everett Public Works, at 259-8800. <br />Standards for vegetated swale construction have changed <br />recently and are not yet included in the standards manual. <br />The paragraphs given in the attached sheet entitled <br />�. <br />"Construction of Vegetated Swales" must be included on the <br />plans. <br />The swale seed and plant list from page IV-17 of the City's <br />standards must also be included on the plans. A copy of the <br />list is attached. The list of additional vegetation for <br />biofiltration swales was written for a one foot wide swale. <br />Given that the swales on this site are designed to be wider <br />than one foot, the specification for each vegetation type <br />must be changed from 1125 clumps per lineal foot of swale" to <br />1125 clumps per eguare foot of swale". <br />5� r <br />The swale construction notes and swale planting/seeding <br />requirements must be shown on both the landscaping plan and <br />the storm drainage plan, as well as the attached detail <br />Crr �Z1'D'V <br />showing the cross-section of the biofiltration/grass swale. <br />�sn)�(t . <br />The entire associated side slope of the Swale, from the <br />✓ <br />bottom of the Swale to the top of the adjacent bank, must <br />have a maximum slope of 1:1, unless rockeries or retaining <br />walls are used. <br />now control structure (restrictor cbft <br />T <br />The location of the flow control struct e(s Ost be <br />`fi I,Rn7 clearly shown on sheet C1.2. <br />6410 <br />A detail of the flow control structure(s) must be provided <br />(tih✓ loF Z in the plans. All orifice elevations and sizes must be <br />GZ. clearly shown, as well as the overflow elevation. <br />L:; <br />