Laserfiche WebLink
� <br />STAFF REPORT TO HEARING EXAMINER <br />SHORELINE A�NNAGEMENT SUBSTANTIAL DEVELOPMENT PERMIT <br />CASPER CREEK TOWNHOUSES <br />SMA #2-92 <br />September 9, 1992 Q�� '� � <br />Applicant: Carl Bloss <br />Schneider Homes, Inc. <br />6510 Southcenter Bivd. <br />Tukwila, WA 98188 <br />Representative: Steve Anderson <br />Groups Four, Inc. <br />18030 Juanita-Woodinville Way NE <br />Bothell, WA <br />Planning Coordinator: <br />Requested Action: <br />Mary Cunningham <br />259-8731 <br />Shoreline Substantial Development Permit per <br />E.M.C. 20.12.080 <br />Description of Project: Phase I- The demolition of a single family house, <br />garage, and shed, and the construction of 110 <br />townhouse units in 25 buildings on a 10.19 acre <br />Project Location: <br />General Plan Designation: <br />site. <br />Phase II - Construclion of 12 townhouse units in 4 <br />buildings on a 1.2 acre site. <br />The buildings would range irom one to three-story <br />structures. <br />The site is located in the North Creek drainage <br />basin. Silver Lake Creek is located on and <br />adjacent to Phase II. The proposal inGudes the fill <br />of wetlands and mitigation, which consists of <br />expansion of existing wetlands and enhancement <br />of wetlands and wetland buffers. <br />south of Silver Lake Road (121st St. SE), <br />approximately 750 feet west of 19th Ave. SE <br />1.6: Multiple Family 15-25 dwellings per gross <br />acre <br />Zoning Designation: Phase I- R-3(A) <br />Phase II - R-3 <br />(see Casper Creek Vestlng Decision, Exhibit 8) <br />