Laserfiche WebLink
All other signs must comply with the moct restrictive requirements of the SMP and <br />the Zoning Code. <br />All excess public right-of•way between the frontage improvements and the lot line <br />must be landscaped to Type III Standards of the current Zoning Code. <br />5. The Applicant and/or the applicant's contractor must notify the City of Everett if <br />any possible archeological data are uncovered during excavation or <br />development. Failure to comply with this requirement shall be considered a <br />violation of the Substantial Developmer.t Permit. <br />6. A complete building permit application for Phase I must be filed within 90 days of <br />issuance of a Shoreline Substantial Development Pertnit for the proposal and <br />such filing must result in issuance of a building pertnit. (See Casper Creek <br />Vesting Decision, Exhibit 6.) <br />Construction or substantial progress toward construction of Phase II must be <br />undertaken within two years after final approval of the Shoreline Substantial <br />Developmc:�; Permit, and completed within five years. If Phase II has not been <br />completed in this time span, the pertnit will be reviewed by the Planning <br />Department which will do one of the following: <br />- extend the pertnit for one year, or <br />- tertninat�i the pertnit. <br />The Applicant must conhibute $55D per unit or a total of $8i,100 to the Parks <br />Department for shoreline public access improvements at Silver Lake. <br />Prepared by:� QM� (� <br />_ � �_ <br />Reviewed by, v�1�y� �� ;,�.�„ "' <br />��T <br />shoAine <br />� <br />