Laserfiche WebLink
the stage-storage relationship of the pond, or the berm <br />�esiqn must be modified so that water is not retained in the <br />first cell of the pond. <br />Car wash area oil/water a�arator/arit removal vaultt <br />Calculations for the �ar wash area oil/water separator must <br />be submitted as part of the drainage calculations. The <br />oil/water separator must be sized to give a 15 minute <br />detention time for the anticipated hose flow to the area. <br />The anticipated hose flow must be stated, and jusYification <br />for the n'umber u�ed must be gi�en. <br />etormwater auality enhancement system: <br />Developed site conditions must be used in determining the <br />design flow for the swale and oil/water separator. However, <br />due tu the location of the water quality enhancing featnres <br />downstream of the detention system, the design flow for <br />these features can be the City's allowable detention release <br />(10 year peak discharqe for existing conditions). <br />PLAN REVIEW COMMENTS <br />Diveraion atructure: <br />By using the City�s allowable detention release as the swale <br />and oil/water separator desiqn flow, overflows from the <br />detention sysLem can be bypassed around the swale and <br />separator at the restrictor manhole to eliminate the need <br />for a separate diversion structure. However, oil tends to <br />accumu:ate in restrictor catch basins. Therefore, when <br />detention overflows bypass an oil/water separator, the <br />overflow structure �ust be modified so that overflows do not <br />contain larqe amounts of oil. <br />A floatable material separator may be used on the detention <br />overflow if enougti clearance exists Uetween the overflow <br />elevation and the roof of the manhole structure (a minimum <br />of 1.5 feet is necessary betwr:en the top elevation of thc <br />manhole/cb and the ciown of the overflow pipe to meet all <br />city �tandards r�garding installation, cover requirements on <br />ti�e pipe may also be an issue). Otherwise, a baffle, made <br />of a larger diameter pipe and welded to the overflow <br />standpipe, must be added to the overflow/bypass structure. <br />The space between the baffle and the overflow standpipe must• <br />be large enough to not cause restriction of flows. The <br />baffle should be stiffened by welding a"rib" from the <br />standpipe to the baffle, and should extend a minimum of 2 <br />inches above and 6 incl�es below the overflow elevation. <br />