My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1600 121ST ST SE 2016-01-01 MF Import
>
Address Records
>
121ST ST SE
>
1600
>
1600 121ST ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 10:56:45 AM
Creation date
4/14/2017 10:16:29 PM
Metadata
Fields
Template:
Address Document
Street Name
121ST ST SE
Street Number
1600
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1894
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Costs shown for the links were estimated by Group Four, Inc. <br />Costs for siqnalized intersections vere estimated by Christopher <br />Brown and Associates. All fiqures are in 1989 dollars. <br />� Link M1. 19th Ave. <br />�' widen link to five <br />Clearinq and grading <br />Pavinq, curbs, walks <br />Drainaqe <br />Sub-Total <br />with associated signinq and strip <br />Engineerinq (20 percent) <br />Continqency (15 percent) <br />Link Total <br />Casper Creek Project Share <br />S 75,000.00 <br />E 96,500.00 <br />S 74.000.00 <br />5245,500.00 <br />S 49,100.00 <br />S 36.825.00 <br />�i31,425.OG <br />1995 averaqe p.m. peak hour traffic <br />volume on section 2857 v.p.h. <br />Casper Creek traffic volume 16 v.p.h. <br />Casper Creek project share 0.56 percent <br />Casper Creek project cost 51,856.07 <br />_ L117k_M2. 19th Ave- S F 116th S*rnnh S r �n <br />Widen link to five lanes with associated sign <br />Clearing and grading <br />Paving, curbs, Walks <br />Dralnage <br />Sub-Total <br />Engineering (20 percentl <br />Contingency (15 percent) <br />Link Total <br />Casper Creek Project Share <br />S 95,000.00 <br />5201,000.00 <br />S 90.400.00 <br />5386,400.00 <br />S 77,28U.00 <br />S 57,960.00 <br />55�1,640.00 <br />1995 average p.m. peak hour traffic <br />volume on section 1996 v.p.h. <br />Casper Creek traffic volume 19 v.p.h. <br />Casper Creek project share 0.95 percent <br />Casper Creek project cost 54,965.51 <br />-14- <br />._ <br />, ) tia <br />�"y <br />/ ''� <br />/ �..' yy . <br />/ 1v . <br />I- '� <br />1 <br />I �� <br />�� <br />. i• <br />striping. <br />amiu� I_I._�_...�_ <br />P �' o�.�°L. <br />Chnatopher Broa�n �a ,1aaociatca <br />8I9 Rainier ,1vcnue N.. 5uilc .1-201 <br />Rcnton. WA 9805i-1380 <br />
The URL can be used to link to this page
Your browser does not support the video tag.