Laserfiche WebLink
�,� r.+nk M3. 19th Ave._ S.E.. 12 <br />Widen link to `five lanes wi <br />Clearing and grading <br />Pavinq, curbs, walks <br />Drainage <br />Sub-Total <br />Enqineerinq (20 percent) <br />Contingency (15 percent) <br />Link Total <br />Casper Creek Project Share <br />1995 average p.m. peak hour <br />volume on section <br />Casper Creek traffic volume <br />Casper Creek project share <br />Casper Creek project cost <br />associa <br />$ 80,000.00 <br />;215,720.00 <br />S 99.900.00 <br />5395,620.00 <br />S 79,124.00 <br />f 59.343.00 <br />5534,OB7.00 <br />traffic <br />2083 v.p.h. <br />25 v.p.h. <br />1.20 percent <br />S6,410.07 <br />str <br />'� r.,rPrsection M1, 19th Ave. S.E./121st Street S.E. <br />� Construct new fully actuated, mast arm traffic signal with 8 <br />phase controller, striping and illumination (if needed). <br />Construction <br />Sub-Total <br />Enqineering (20 percent) <br />Continqency (15 percent) <br />Intersection Total <br />Casper Creek Project Share <br />1990 p.m, peak hour <br />enterinq traffic volume <br />1995 p.m. peak hour <br />entering traffic volume <br />Difference <br />Casper Creek traffic volume <br />Casper Creek project share <br />Casper Creek project cost <br />�� i� �� <br />�� ��� �� <br />S 20,000.00 <br />� 15.000.00 <br />E135,000.00 <br />1457 v.p.h. <br />2280 v,p.h. <br />823 v.p.h. <br />44 v.p.h. <br />5.35 percent <br />S7r217.50 <br />�- 4 <br />�' :� <br />�� <br />n J <br />. ^_ ✓ <br />�; <br />�4 Tnteraortiorl N2. 19th Ave. S.E./116th Street S.E. <br />Relocate mast arms, install new controller if needed, stripinq <br />and illumination (if needed). <br />-15- <br />FXNllir � � <br />P Z� OE..�.._ <br />Chnatopher Broan �a ,1:,eoaa�ca <br />II� 8Y9 Rainier Avcnue N., bwlc 1•201 <br />Renton. WA 9805i•1380 <br />�, � (206) TfZ-ll88 <br />