Laserfiche WebLink
��� <br />��x <br />YH�GI~A <br />Hx� <br />K n <br />H X1 <br />� M'i1 <br />Vl H <br />�O� <br />OH <br />��8 <br />n � c� <br />ry� <br />r+ y <br />g`� <br />H <br />C�Cy <br />��th <br />z H cn <br />H O cn <br />� <br />' C_I <br />� � <br />� �,� i,•�.� : i ., <br />Condltions from Shoreline Substantial Development Permit <br />Currier <br />i)eL,ail�d drauinqs in accordance WLth City desl� and construction <br />atandards shall be submLtted to the Public Works Department shoWing <br />.,..e parking layout, LanCscaping, utilities� storm drainage� temporary <br />construction erosion contrnl, and all required improvements in the <br />p���bLic right-of-Nay. Publlc Works Department approval of these <br />�]r�wings is required prior to any permits being SssueA. All <br />l.nprovements shall be completed, approved, and Narrauted before the <br />O�:rupancy Permit is issued. <br />2. �Cen (70) feet of righC-of-Way is to be dedicated to the City for street <br />purposes on 75th Drive S.E. and Silver Lake Road. Additional <br />right-of-way Will also be required on 19th Avenue S.E. vith the <br />�pecific width of said right-of-�day dedlcation to be determined by the <br />P!ib11c Works Department prior to issuance of constructior. permits. <br />3. r�iil standard street improvements are required to Silver Lake Road and <br />t�;r.0 Drive S.E., including, but not limited to curb, gutter, sideualk, <br />,,�;�ret widening and storm drainage on the property's full fr�ntage, <br />pl�is transitions per City standards. <br />4. Puli standard street improvement:f are required to 19th Avenue S.E. <br />(6othe1l-Everett Highuay, SR-527), including, but not limited to curb, <br />t;utter, si�eualk� street aidening, and storm drainage on the property's <br />f�.iL1 fronCage plus transitions per City standards. <br />��,, ,.,_ Applicant must participate ln a traffic study Lhat wiil be <br />submitted to the Publlc Worka Department for approval.. The study must <br />address signalization, channelization, lane configuration, pedestrian <br />movements, and rLght-of-way for lyth Avenue S.E. and Silver Lake Aoad, <br />and need for bus turnouts. Miti�iat.on measures must be implemented in <br />compliance with recomnendation? contained in the traffic study and <br />approved by the City's Traffic Engineer. If the City desires a <br />thorougl� tra.^fic study of streets other tha.n those immediately fronting <br />the Applicant's �roperty, the ppplican*. shall only be responsible for <br />preparation of a porticn of the acudy. That portion shall be the <br />impac: that the Applicant's development has on the surrounding <br />streets. <br />5uilding Perm:Ls for the Applicant's dr,velopment shall be issued only <br />When: <br />(ll The Silver Lake Area Wide TrafCic Study is completed� and <br />(?j The Applicant agrees to comply with 311 the traffle improvements <br />deCined in and required by the Silver Lake Area 'dide Traffic <br />Study. In addition, treffic improvements must be covpleted prior <br />to the issuance of any �uilding Permits Cor construction, or, the <br />,lppllcant must agree to comply Nith all the traffic improvements <br />d�flned in and required by the Silver Lake Area 'dide Traffic <br />;Ludy. If Lhe Applirant opts ior the Agreement, a performance <br />bond must 6r posted at the time of the Agreement. F'ailure to <br />{;.r;t. �afd bnnd Witi vni�1 the permit. <br />� <br />