Laserfiche WebLink
��� <br />��� <br />�H� <br />H�� <br />K C] <br />H� <br />� M � <br />ti H <br />�o� <br />OMd <br />H�g <br />�Y � <br />ry� <br />HH <br />8y <br />nCCy <br />hi <br />�H� <br />HOti <br />protected from any construcr_ion a�tivity. Once ±.he trail <br />is field located, o�,:r engineers will provide the necessary <br />documents for the required easements. Centron doe� not <br />have a problem with a condition of the Building Permit <br />being that the trail easement documents must be recorded <br />prior to the issuance of any Certificate of Occupancy. <br />Regardina item q4 of the review letter, Centron feels that <br />the cost of maintenance of the landscaping associated with <br />the trail can be easily absorbed into �ur overall site <br />maintenance programs. Centzon is stiil more than rcady t� <br />work with the City to best integrate our recognized <br />commitment of 821,743.00 relating to the trail and <br />landscaping install.ation. we ��ould like to cnntinue to <br />work with the Parks Department to best allocate these <br />funds. we feel that the best solut'_on to the total <br />installation of the trail ar3 the lar3scaping will be <br />forthcoming in the near future. The issuance of the <br />Building Permit for this project doe:c not hinge on the <br />finalization of the trail installaticn in that we are <br />cummitted to the landscaping of the affected area. <br />I hope that this submission adequately addresses the <br />Planning and Park Department's concerns. we are most <br />anxious to obtain all Buildinq Permits for this project. <br />Should you have any additional concerns that must be <br />addressed, please do not hesitate to contact me. <br />Sincerely,�\� <br />� - � �..� <br />__� <br />E. Dennis Rie6e, A.I.A. <br />EDR/ 1}: <br />� <br />