My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1710 121ST ST SE 2016-01-01 MF Import
>
Address Records
>
121ST ST SE
>
1710
>
1710 121ST ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 9:43:11 AM
Creation date
4/14/2017 10:30:40 PM
Metadata
Fields
Template:
Address Document
Street Name
121ST ST SE
Street Number
1710
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9, A one yar warranty is rcquired on the public atrcet improvements for an emourrt <br />not le�s than 10% of the coat of construction and shall run for one year from the <br />date of find approv�ssuance of the first Occupancy Permit. <br />10. A twro ye�r guannta is required for private raentioddetentioa or other drainage <br />tratment/abatemmt ftcilitiea serving aras larger than one acre. <br />1 L On-aite water main will be �taked within �n asemrnt to the City. The aaement <br />will be wbmitted to the City prior to iswana of permita. <br />12, As-builta of storm eewer, amitary sewe�� and wata ayatema will be required to be <br />wbmitted per City Deaign and Construction Standuda and Speciflcations. <br />13. A pe.rmit is required for the deatination of the 611. <br />I4. A Performana Guaranta ia required for etrcet improvementa on I 12th St. ae pnor <br />to any building pemut being issued. <br />15. My broken or demag�.l sidewdk shdl be repsircd/rcplaced per the City Public <br />Worke Inspector. <br />16. The proponent will be required to psy a trat£ic mitigation fa of 511,200 besed on <br />S80.00 per peak hour trip genented.( 580.00 X 140 trips) � Chq rqt� <br />ro �/!� S�iO Pcr A�J/pno��nh� <br />17. Individual prcssure reducing velve will be required on each water service. M S" <br />dianuter watv m�in extended onto this site will be necewry if a&e hyMnt on <br />aite ia rcquired by the Firo Mushall <br />1 S. On-aite detention ia required per Ciry atanduda. Detention muat be calcul�ted for <br />aite vegetative conditions prior to the most recent clenring/development activiry on <br />the site. Treatment of stormwater runoff from the site'a paved erw mun occur, <br />per City umduds. {uior w d+�huBn of the uormwater &um the iite or to a <br />strcam or wedand. New facilities must be sized for dl pavement aasociated with <br />the moat rocent development activity, in addition to new pavement. Stortnwater <br />detention/rctention, qualiry protection, and treatment rcquircmmta for this project <br />shall be thoee requiranenu in effect u the time of application for Public Works <br />perntita. Curtently, three options for stortnwater tratment arc: prexnted in the <br />current City standarda. The Iwt prefeRed option ia dlowed only if the firrt two <br />optiona ue infeasible in the opinion of the Public Works Department. The options <br />for stortnweter treatment ere, in order of proference: <br />A. M infiltration basin designed and construaed according to City nandudt, if <br />auiuble soila exist on the site. <br />B. A wetpond designed end constructed to City standxrds. <br />y/a� <br />
The URL can be used to link to this page
Your browser does not support the video tag.