Laserfiche WebLink
•f <br />� <br />INFORMATION FOR DEVELOPER: <br />Thc following infonnation ia providcd for the devcloper's bencfit. 'It�esc arc not SEPA conditions. <br />All requiranents are preliminary in nature, and ere batcd upon thc preliminary site plan and ihc <br />ordinanccs in effcct at time of submittal for SEPA rcview. The propoid mutt comply �vith dl <br />ordin�nca io eRect at the time � complete buildinQ permit application u filed, includinQ tho:e <br />not �pecificdly ut forth herein. (Exccpdon: For vesting undcr thc Zoning Codc, pleau rofcr W <br />Section 44 of ihe Zoning Code). Contact the Planning Departrnrnt for information regarding <br />appcals proccsses for thc requirements listcd in this document. <br />Detailed drawings in accordence with Ciry Design an; Constniction Standards <br />shall be submitted to the Public Works Department, showing site parking layout, <br />Iamiscaping, utilities, stortn drainage, temporary construction erosion wntrol, and <br />all required improvements in the public right-of-way. Public Works Department <br />approvaf of these drawings is required prior to any pertnita being issued. All <br />improvements shall be completed and approved warranted before the Occupency <br />Perntit is issued/finel approval is granted. <br />2. Full standard (hal� street improvements are required to <br />property's frontage, including but not limited to curb, <br />widening, and drainage control per City Design Standards, <br />4. <br />� <br />8. <br />112th St. SE along this <br />gutter, sidewalks, street <br />Parking must be per City Zoning Code and City Design and Construction <br />Standa�•ds. A minimum of two off-street parking spaces are required per unit. <br />This project must comply with the current City of Everett Building Code and <br />Sprinkler Ordinance. <br />Special cherges for connection to the sewer and water systems in accordance with <br />Ordinance 1171-85 and subsequent revision are applicable. These charges are <br />based on projected water usage and can be substantial. The applicant is <br />encouraged to oi�tr.in a copy of the Ordinance and determine estimated charges <br />prior to building permit application. The actual charges shall be computed by the <br />Public Works Department per the ordinance in eH'ect at the time and according to <br />the infortnation on the approved plans at the time of building pertnit issuance. <br />Lack of cort:ment on the plans submitted with the application does not constitute <br />approval of these plans. <br />A fire hydrantis required within 200 driving feet but not closer than SO feet of <br />every -trvcture. <br />City streets and alleys are to be kept clear of dirt and debris at all times during <br />construction. Dust suppression and street cleaning must occur as directed by the <br />Public Works Inspector. <br />