Laserfiche WebLink
�� A minimum of 4,200 square feet of open sPace is required on the site per Section <br />15.030 of the Zoning Code unless weived by the Plenning Dlreccor. Calcu�adons <br />for open space arcas must be prc,vided on the plans aubmitted for Building Perntits. <br />��On-site recreation facilities must be provided per Section 15.110 of the Zoning <br />Code. For 21 units, with unit sizes over 900 squar� fe�, �e Proj� ��� hBVe a <br />rxrestion impact of .63 acres. Prior to the iasusnce of Bwld�ing Pertnits, the <br />Plenning DePartment muat approve a plan for on-site recreation facilities. As pert <br />of the buildmg pertnit application, the App�icent muat aubmit a recrcation plan <br />including standards and apecificadone for recroation areas and �quipment, both <br />inside and outside the building, includin$ picturea af proposed eq��pmp�t. If <br />sufficient information is not known at dme of submittal for building permits, <br />minimum specifications or examp�ey must be provided. Prior to the iasuance of <br />B����B Pe�mita, the Plenning Deprrtment must approve a plan for on-site <br />recreation facilities. Tot lota must be located in central aroay, W,h� ��uate <br />superviaion of children can be provided. <br />�A9�Building facade modulation and roof line varintion must be provided per Section <br />15.050 of the Zoning Code. The maximum pertnitted wal� and roof lengths <br />, without building facede modulation is 30 feet. <br />�" 41. 1'he Washington State Clean Air Actrequires the use of all loiown, available, and <br />reasonable means of wntrolling air pollution, including duat. Dust generated <br />during constniction activities can be controlled by wetting those duat souras such <br />as ereas of exposed soils, washing truck wheels before they leave the site, and <br />installing and maintaininggravel conswction entrances. Construction vehicle <br />track-out is also a major dust so�rce, Any �dena of track-out can trigger <br />violations and fines from the Department of Ecology or the Puget Sound Air <br />Pollution Control Agency. <br />42• Comply with Review process II.C. # 7-92. <br />GENERAL IIVFpItMATION <br />1• The PUD has sufficient capacity to provide power to this_proposed project, For <br />informadon about the electrica! service reyuirements, please cal( the District's <br />Everett office at 258-8272 to contact a Customer Engineer. <br />