Laserfiche WebLink
O1/12/2005 22:54 2538582534 8 A INC <br />tl <br />MITIGATION PLAN REQUIREMENTS 30.62.345 <br />(1) NOT APPLICABLE <br />(2) MITIGATION PLAN <br />(a) BASE LINE STUDY <br />(b) REPLACEMENT OF LOST FUNCTIONAL VALUES <br />(c) MITIGATION TIMING <br />(d) MITIGATION MONITORING <br />(ej PROJECT BOND <br />(� WETLAND BUFFER PLAN <br />LIST OF FIGURES <br />FIGURE 1: <br />FIGURE 2: <br />FIGURE 3A: <br />FIGURE 3B: <br />FIGURE 3C: <br />FIGURE 4: <br />FIGURE 5: <br />FIGURE 6: <br />LIST OF TAl3LES <br />LOCATION MAP <br />SITE MAP <br />WETLAND A FLAGS <br />WETLAND B �LAGS <br />WETLAND C FLAGS <br />SOIL MAP <br />USGS MAP <br />MITIGATION MAP <br />TABLE 1: WETLAND AREAS, CATEGORIES, AND BUFFERS <br />TABLE 2: MITIGATION LOCATIONS AND AREAS <br />TABLE 3: PLANT LIST <br />TABLE 4: MITIGATION RATIOS <br />TABLE 5: BOND ESTIMATE <br />A�'TACHMENT 1: DATA SHEETS <br />3847 86A, Inc. 1/11/OS <br />7rc a <br />05 <br />