My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1720 124TH PL SE 2016-01-01 MF Import
>
Address Records
>
124TH PL SE
>
1720
>
1720 124TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 7:41:58 AM
Creation date
4/14/2017 10:48:41 PM
Metadata
Fields
Template:
Address Document
Street Name
124TH PL SE
Street Number
1720
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01/12/2005 22:54 2538582534 8 A I� �� 1� <br />outlet device, the surcounding development could dump <br />excess water into Wetland C and kill the trees. Roof run-off <br />and other clean water irom the site wfll be discherged into <br />Wetland C to ensure hydrology and prevent surrounding <br />development from cutting off hydrology. <br />Shore stabilization Is not applicable. <br />Pollution assimllation and sediment retent�on will be <br />unchanged for Wetlands A and B. Wetlahd A will be slightly <br />fllled, but it will be insigniFicant compared to the remaining <br />aroas of Wetland B and lhe conslricted outlets. The pollution <br />assimllation and sediment rotention of WeUand C will be <br />enhanced, as there will bo an ove�low forcing stream water to <br />dump into Wetland C from tho surrounding developed �rea. <br />Floodwater and storago of Wetlends A and B will be relatively <br />unchanged. Watlend A wfll have a loss of some storm water, <br />but lhis wlll be restored through the construction of tract 996, <br />the storm water trect. Wetland C will have an Increased velue <br />for service run-oH and 11ood storago by receiving water from <br />the development and discharge through a controlled outlet. <br />StoRn water retention is tho same as above. <br />Stream base flow maintenance will be relatively unchanged. <br />There w(II be a slight modification of Wetland C, but it will not <br />bo measurable. <br />There wili be no chango in ground water recherge. <br />(t,) BuHer Functional Values Replacement <br />BuHer functional valuo for flsh and wlldllfe will be enhanced <br />over the standard proJect approach. In the standard project, <br />tract 996 would be designated lots to be cut and cleared. <br />Under the proposed large area of tract 996, the butfer added <br />area would be preserved. This will be desfgnated buffer of <br />Wellands A and C and be a substanUal enhancement over the <br />traditional 25-foot buifer. <br />Runoff absorption of the enhancod buffer will Improve over <br />existing condltions. <br />3BA7 B8/1, Inc. 1111I05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.