Laserfiche WebLink
In the mecting of 1/22/97, you offered to sell us your property and hoiie. We are �ot in a <br />position to accept that offer at this time. We will inform the State Di pertm�,.t of <br />Transportation of your ot%r, as they may bc looking for locations for a stortnwater <br />detention facility for the Highway 527 widening. If you feel that your �roperty is unlivablc <br />and selling the property is your only option, and that actions of the Co�nty, the Ciry of <br />Everett, or the State caused your problem, the process for being recompensed is started by <br />�ilinE Claims for Dan.ages with the jurisdictions involved. We previously sent you coFies <br />of claim forms; please call me if you need fresh copies. <br />Again, we recognize that you are in a frustrating position, but our limitc�+ funding allows <br />us to design and construct only a few of our many high-priority projects yearly. We will, <br />however, add this problem to our Six-Year Capital Improvement Program for annual <br />reprioritization. As we have insutiicient }'unding at this time to address the larger Silver <br />Lake-Rugg's Lake flooding problems, I believe that your best solution would be to work <br />with the State Department of Transportation tu resolve your flooding issue during the <br />road widening project. If you have any questions about this letter, please contact me at <br />(206) 388-6410, or Mohammed Kashani at (206)388-3464, extension 4571. <br />Sincerely, <br />`oa�C�C'�-�-� <br />Joan Lee, P.E. Director, Surface Water Management <br />cc: Gary Weikel, Executive Director <br />Peter Hahn, Public Works Director <br />Mohammed Kashani, P.f. Capital Improvements Program Manager <br />Karen Kerwin, P.E. Drainege Supervisor <br />Dan Mathias,P.E. City of Evcrett Public Work <br />