Laserfiche WebLink
COMPLIANCE " r r . r <br /> REQUIRED <br /> H� i'leat ctputGO: OTHUl (gas,qll,prapanv ;n t11 <br /> INSPECTION IMPORTANT: DO1IO2 place checks In the two left columna. <br /> APPROVED <br /> C:] O Q Exposed foam Insulation shall comply as follows (S. 502.1.4.7): <br /> O Protected with metal or plastic flashing, or other suitable material that extends below grade. <br /> ❑ Insulation is approved for sub-grade, exterior use and properly Installed. <br /> C7 ED EAlrffow between fresh air ports and the whole-house fan ensured by undercut doors/grills(VIAQ,S. 302.6.4) <br /> ED O ®Looseflll Insulation OK N (S.502.1.4.5): <br /> L] maximum ceiling slope not > 3 in 12 <br /> 0>30"of clear distance from top of bottom chord to underside of roof sheathing at the roof ridge. <br /> O O s 6 Rill black polyethylene ground cover, shall be lapped 12" at joints and extend to foundation wall <br /> 0 p s Clearances shall meet listed minimums between insulation and (S.502.1.4.3): <br /> ❑ chimney ❑Non-IC rated recessed lights: 1/2"to combustables, 3"to insulation. <br /> O C3 7 Attic hatch shall be insulated to required ceiling R-value and is wealherstripped (5.502.1.4.4) <br /> p p Attic access shall have wood dam or equivalent to retain loose fill insulation in attic(S. 502.1.4.4) <br /> C3 9 All exterior doors (except 20 minute doors) shall be weatherstripped (S. 502.4.3; <br /> _71p e Service hot & cold water piping in unconditioned spaces shall be insulated to R-3(S. 503.11) <br /> 0 O r Service recirculation hot water piping in unconditioned spaces shall be insulated to Table 5.12 levels. <br /> O E3 z)Heat pump thermostat shall have progamable capability (S. 503.8.3.5) <br /> O O 2 hermostat provided for each HVAC system with range of 55-75• F.(heating) (S.503.8.1.1). <br /> ED D Readily accessible,automatic or Manual means provided to restrict or shut-off Heating input to each <br /> zone or floor during periods not requiring Heat (S. 503.8.3.1). <br /> ED ED18upply <br /> ontrols for backup heat prohibit similtaneous operation of the primary system (S. 503.2.2(3)). <br /> O O echanlcal ventilation system shall have proper timers, and/or switches (VIAQ, S. 302.3). <br /> ED Oechanlcal ventilation ducts shall have R-4 Insulation in uflcondllionp spaces (VIAQ, S.302.5) <br /> E] p echanical ventilation supply ducts in ccnditimad spaces shall have R-4 insulation (VIAQ, 302.5) <br /> ED EJ ducts shall have volume dampers, or the equivalent,to balance system(S. 503.6). <br /> O Oupply and return air ducts shall have sealed duct joints in uncondit;=ed spaces (S. 503.10.2). <br /> O C] r VAC plenums, supply, and return air ducts shall have H-8 insulation (Table 5-11,Ail options) <br /> O O2 Iectrlc water heater(s) shall have (S.504.2.1, 504.3, 504.4) : <br /> ❑separate power shut-off 0 1987 NAECA Lable on tank <br /> ❑ noncompressible R10 pad (unheated spaces only) 0 Temperature settings 120 F. <br /> O ED @DShowers and lavatories shall limit flow to,.g 3.0 gallons/minute (S. 504.0.1). <br /> O CI ®Swimming pools(S.504.5) shall have: <br /> 0 readily accessible ON/OFF switch(pump, heater) ❑Pool cover ❑Piping insulated to S. 503.11 <br /> O O esAll fireplaces (VIAQ,S. 402.3) shall have: <br /> O 6 square inch combustion air supplyducl w/ accessible damper directly connected to the fire box <br /> p Tight filling glass or metal doors. 0 Tight fitting flue damper <br /> O El ,a Solid fuel burning appliance(s) (VIAQ, S. 402.2) shall have: <br /> ❑Tight lilting glass or metal doors <br /> 00utside combustion air source directly connected to the fire box <br /> 1:3 Exception: Non-direct, 4"diameter, dampered, combustion ail source:allowed only for(1) new stove <br /> installations in existing homes where obstructionsprecludes direct combustion air, or(2) Central <br /> heating systems located in unheated spaces. <br /> p EDr Three month, etched track radon monitor, printed instructions, and information sheets shall be supplied <br /> I <br /> o 111e single family dwelling or first floor units of multi-family dwellings by the general contractor(VIAQ,S. <br /> 502.2.1), <br /> WSEC Final phase requirements: — — - <br /> Inspected by:_ Date <br /> Page6of6 __ - <br />