My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1228 58TH PL SW 2016-01-01 MF Import
>
Address Records
>
58TH PL SW
>
1228
>
1228 58TH PL SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 9:57:33 AM
Creation date
4/17/2017 9:57:23 AM
Metadata
Fields
Template:
Address Document
Street Name
58TH PL SW
Street Number
1228
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLIANCC i I zY -, ,E 4A .,I,r��srR.71.>,I1'AIK �x .0 0 <br /> nEOUBFD <br /> hent Source" 0T H:T4 (gds,Er T <br /> .111, ptOnAf7C, ilea( n7tnttls} Onr 1 <br /> INSPECTION IMPORTANT: Supply Information In the shaded area by checking the appropriate circles. <br /> APPnOVED Disregard topics that don't descriha your building or equipment.DO NOT place checks In <br /> the two left columns. <br /> ❑ ❑ Q Slab Insulation (Table 6.2)shall be R-10 and located on the 41 <br /> QA. Exterior (See INSULATION INSPECTION). AP <br /> OR <br /> QB, Inferior extending downward from the top slab surface to Its undersurface and <br /> horizontally under the slab for a total distance of 24", or vertically 24". <br /> ❑ ❑ Radiant Stab Insulation (S.502.1.4.9) shall be R-10 and extend under file entire slab <br /> ❑ ❑ s Below grade masonry wall Insulation(S.502.1.4.10)shall be full-depth and located on the: <br /> Q4. Exterior and rated R-10(See INSULATION PHASE). <br /> OR <br /> QB. Inior;cr (See INSULATION PHASE) <br /> ❑ ❑ °0 Thermal breaks) shall be placed In the slab(S.502.1.4.8,201.1:BUILDING ENVELOPE) <br /> between the conditioned and unconditioned spaces chocked below, and extend from the top of the <br /> slab to the bottom, then underneath toward the conditioned space for a 24". <br /> Qdwellingigarage o dwelling/connected spaco O slab edge and foundation wall. <br /> ❑ ❑ sQ Radon Requirements(VIAO, S.502.1) shall be met if one of the following Is chocked: <br /> Q A. Net foundation ventilation area is less than 1 FT2 per 300 F12 of crawl space <br /> 0 B. Foundation vents are closable. <br /> Q C.Crawl space acts as a supply,or return air plenum. <br /> [WSEC Foundation phase requirements.ectted by: y{A Date <br /> ❑ ❑ s All structural panels such as plywood, oriented strand board, particle board, and wafer board shall be <br /> labled "EXPOSURE I","EXTERIOR",or"HUD•APPROVED". (VIAO,S. 401.1) <br /> ❑ ❑ Insulation baffles shall be placed in attics/coilings to main,ain at least 1"ventilation space and extend at <br /> least 6"vertically above batts or 12"vertically above loosefill Insulation(S. 502.1.4.5). <br /> L1 ❑ QGlazing efficiency required under the snlectod option shall be (S. 502.1.5, 602.7.2,Table 6-2): <br /> 0s t 1.70 (Option I) Os U.65(Options II, IV) 0s U.75 (Option III) <br /> t 0.60(Option V) s U.50 (Option Vl) O s U.45 (Option VII) <br /> Symbols used: = equals >greater than <less than r. greater than or equal s lees than or equal <br /> UPDATLD SET.EMBEll 1991 <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.