Laserfiche WebLink
IrAPPPROVED <br /> enoN IMPORTANT:Please supply Information in the shaded boxes and check the appropriate <br /> circles. Disregard topics that don't describe your building or equipment.DD NOT place <br /> checks In the two left columns. <br /> FRAMING a <br /> O C3 Q Glazing/skylights by type See the Washington glazing directory <br /> No. Manufacturer Frame material #Layers Model# Area (Ft2) Uo value Tested? <br /> I lR.�_ 8 �3e. U. 6x- Yes <br /> U.__ Yes Q <br /> U.— Yes 0 <br /> U._ Yes Q <br /> U.__ Yes 01 <br /> rl.S ?.` 3` ) U._ Yes Q <br /> 2 30 �` �' U.— Yes CQ <br /> I aL U.— Yes Q <br /> U.— Yes Q <br /> _ (z ' U.— Yes Q <br /> Q re single Glazing (No more than 1%of healed Moor was before doubling,S.602.72) U.— Yes Q <br /> Type: No: Area: X2 U._ Yes O <br /> Type: No: Area X2 U._ Yes O <br /> Q O it Untested Glazing (Use only default U-values In cheple(,o,S.1006.1) <br /> Type: No: Area: U— <br /> Type: No: Area: U•— <br /> TOTAL GLAZING AREA (Add entire column) <br /> O O rs Maximum Allowed glazing area(S.602.7.1) is derived by taking the the total glazi__ng area t <br /> of �. Ft2 and dividing by the total conditioned floor area of I�Y� 1712. 13 <br /> Multiply this number by 100. This value can't exceed thelazing percentage for your selected option: <br /> Q s10%(Option i) Q s 12%(Option ll) s 21% (Options III,IV,V) <br /> Q s26%(Option VI) O s 30%(0 tion VII) <br /> O O EDocumentation Insufficient, U•values shall be Justified by Mir.testing report. <br /> ED O ra Glazing air leakage(S. 502.4.3 (c)) measures shall be met as follows : 131 Aloe – 13.1 clo <br /> ❑ fixed site built: stops with sealant. <br /> ❑ operating site built:wealherstripped with closer <br /> O l� rs Concealed Insulation shall be placed: ❑ behind shower/tub ❑ behind partition studs/comer <br /> ID Ore Standard air leakage (S. 502.4.3) caulking is complete and installed in the following locations <br /> 1) between Sole plate/subiloors 4) partition stud penetrations <br /> 2) wiring/plumbing/duct register penetrations 5) light fixture/flue penetrations <br /> 3) rim joists/mud sills (heated lower floors) 6) around window and door I•-Page 3 of 6 <br />