Laserfiche WebLink
7 <br /> Potential Permit/ Lead Trigger Design Detail Estimated Processing Comments <br /> Approval Agency Required Time <br /> National Pollutant Ecology Stormwater discharges from construction sites Construction 30 days Requires formal <br /> Discharge of one or more acres details and published notice and <br /> Elimination System Stormwater preparation of a <br /> (NPDES)General Triggered by construction activities that Pollution Stormwater Pollution <br /> Permit for Storm require clearing and grading. The Prevention Plan Prevention Plan <br /> Water Discharges following Master Plan work could trigger <br /> associated with this permit: <br /> construction <br /> activities • Bigelow Creek/South Wetland <br /> Complex <br /> • Walton Creek/North Wetland <br /> Complex <br /> • RR Corridor Trails and Wetland <br /> Mitigation <br /> • Riverbank Enhancements <br /> • 3-Acre Park Construction <br /> • Trail Realignments to avoid bank <br /> instability areas that impact <br /> wetlands or drainages. <br /> • West Wetland Complex <br /> Enhancements. <br /> WASHINGTON DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION(DAHP)AND WASHINGTON STATE HISTORIC <br /> PRESERVATION OFFICE(SHPO) <br /> Archaeological Washing Ensure that proposed activities do not affect Description and At least two weeks, **A Federal nexus <br /> Approval;Section ton State any development,known historic or culturally location of project— usually done exists where projects <br /> 106 of the National Departm significant sites. Local cultural and historic requires visit to concurrent with the require work in <br /> Historic ent of evaluation also required. OAHP to search triggering federal federally controlled <br /> Preservation Act Commu records. permit or funding properties,work <br /> nity Triggered by any federal permit(see process. requiring federally <br /> Develop above). issued permits(i.e. <br /> USACE Section 10 <br /> Dent, and 404);and/or <br /> DAHP projects that will use <br /> federal funding. <br /> Executive Order 05- Washing State Funding for projects that lead to Description and At least 2 months. <br /> ottreqgired if <br /> process <br /> 05 ton State construction**. Ensure that proposed location of project— <br /> Office of activities do not affect any development, requires visit to is triggered. <br /> Commu known historic or culturally significant sites. OAHP to search Requires notice by <br /> nity Local cultural and historic evaluation also records. lead state agency. <br /> Develop required. <br /> ment, <br /> DAHP Triggered by any state funding for <br /> projects that lead to construction. <br /> C-3 <br /> 91 <br />