My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/03/31 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/03/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 9:58:42 AM
Creation date
4/17/2017 9:57:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/31/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> Potential Permit/ Lead Trigger Design Detail Estimated Processing Comments <br /> Approval Agency Required Time <br /> LOCAL—CITY OF EVERETT <br /> SEPA EIS or SEPA State or local"actions"such as issuing Typically MP level Environmental <br /> Checklist lead permits,or adopting plans. SEPA requires all design. May Checklist—3 to 6 <br /> agency governmental agencies to consider the require 30%design months <br /> City of environmental impacts of a proposal before for critical elements <br /> Everett making decisions. EIS—6 to 12 months <br /> Triggered by any project action <br /> Shoreline City of Interfering with normal public use of As contained in the 2 to 4 months May require notice <br /> Substantial Everett water/shorelines of the state,or developing or JARPA application and a pubic hearing. <br /> Development conducting an activity valued at>$5,000 on <br /> /Conditional Use the water or shoreline area. <br /> Permit <br /> Triggered by any project action as all <br /> proposed work elements are within the <br /> shoreline zone. <br /> Floodplain City of Fill or development with the 100 year As contained in the 2 to 4 months FEMA is currently <br /> Development Everett floodplain or floodway. Some projects,such development reviewing local <br /> Permit as restoration,may be exempt or qualify for applications floodplain ordinances <br /> expedited reviews. for consistency with <br /> a recent Biological <br /> Triggered by any project action as all Opinion and is <br /> proposed work elements are within the developing <br /> floodplain. prescriptive standards <br /> to address impacts to <br /> ESA regulated <br /> species resulting <br /> from development in <br /> the floodplain. <br /> Development within <br /> the floodplain should <br /> be reviewed for <br /> consistency with <br /> FEMA guidelines <br /> prior to submitting <br /> for a Floodplain <br /> Development Permit <br /> Compliance with City of Project proposed near or within critical areas Critical Areas Study Varies City regulates <br /> Critical Areas Everett or their buffer. Critical Areas in the <br /> Standards Shoreline Jurisdiction <br /> Triggered by any project action as all through a separate <br /> proposed work elements are within code section than <br /> designated critical areas or their buffers. Critical Areas outside <br /> of shoreline zone. <br /> All Master Plan elements are anticipated to <br /> Trigger this review <br /> Construction City of Construction activities. Detailed design 45 to 90 days Permits can be <br /> Permits Everett plans and sequenced. <br /> c Grading Triggered by any project action except excavation/fill <br /> ® Building landscape plantings if done within limits volumes. <br /> O Foundation specified in Individual permit conditions. <br /> o Electrical Construction of the new restroom facilities <br /> 9 Etc. would trigger more construction permits <br /> than other elements. <br /> C-4 <br /> 92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.