Laserfiche WebLink
i <br /> Exhibit C <br /> z sgT <br /> 6 *1' 2010 SCHEDULE OF CHARGES <br /> Personnel: <br /> Labor will be invoiced by staff classification at the following hourly rates,which are valid <br /> from January 1,2010 to December 31,2010. After this period,the rates are subject to <br /> adjustment. <br /> Senior Principal $187.00 <br /> Principal 175.00 <br /> Principal Associate/Senior Associate 162.00 <br /> Principal Engineer/Associate 155.00 <br /> Senior Engineering Associate 149.00 <br /> Senior Engineer 142.00 <br /> Engineer VII 134.00 <br /> Engineer VI 128.00 <br /> Engineer V 121.00 <br /> Engineer IV 112.00 <br /> Engineer III 106.00 <br /> Engineer II 100.00 <br /> Engineer I 93.00 <br /> Senior Technician 109.00 <br /> Technician 93.00 <br /> Junior Technician 77.00 <br /> Administrator 82.00 <br /> Clerical 66.00 <br /> Project Expenses: <br /> Expenses incurred in-house that are directly attributable to the project will be invoiced at <br /> actual cost. These expenses include the following: <br /> Computer Aided Design and Drafting $13.00/hour <br /> Mileage , Current IRS Rate <br /> Direct Communication Charges At Cost <br /> Postage and Delivery Services At Cost <br /> Printing and Reproduction At Cost <br /> Travel,Lodging and Subsistence At Cost <br /> Outside Services: <br /> Outside technical,professional and other services will be invoiced at actual cost plus <br /> 5 percent to cover administration and overhead. <br /> Everett MURRAY,SMITH&ASSOCIATES,INC. <br /> 2010 Enginele f lanners <br />