Laserfiche WebLink
Y <br /> 9 <br /> Exhibit A- Description of Changed Work <br /> Project Description: <br /> • <br /> Provide construction drawings and specifications to install a new Safety Platform for the <br /> Water Pollution Control Facility Primary Clarifier Scum Concentrator Tank. <br /> Provide an Engineering Cost Estimate for the construction and installation of roof top <br /> Safety Rails at the Water Pollution Control Facility. <br /> Provide and Engineering Cost Estimate for the construction and installation of a new <br /> Primary Clarifier Scum Tank Concentrator Safety Platform. <br /> Scope of Work: <br /> Task 7—Mechanical Engineering—Scum Tank Platform Installation <br /> • Prepare structural construction documents including modifications to existing <br /> equipment to accommodate the installation new scum tank platform. Documents <br /> will be prepared using AutoCAD 2009. <br /> • • Provide structural specifications in the form of structural general notes on the <br /> drawings. <br /> • Provide stamped calculations as required by the permitting agency and respond to <br /> questions or comments from the permitting agency. <br /> • Provide onsite support during construction phase. Two site visits. <br /> Task 8—Cost Estimate • <br /> • Prepare Engineering Cost Estimate for Safety Rail Construction and Installation <br /> ' (Tasks 5 &6) and Scum Tank Platform Construction and Installation(Tasks 1,2 <br /> &7). <br /> EXHIBIT B <br /> Task 7 <br /> • Lump sum in the amount of$7,700.00. <br /> Task 8 <br /> • Lump sum in the amount of$800.00. <br /> TOTAL $8,500 <br /> C:\Documents and Settings\pberger\Local Settings Temporary Internet Files\OLKE8\WPCF D15184 Amendment#I.doe(YJ 7/1511999) <br />