My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/04/21 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/04/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 10:45:14 AM
Creation date
4/17/2017 10:44:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/21/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A preliminary list of drawings anticipated to be included in the Contract Documents is shown <br /> below: <br /> Drawing No. Description _ <br /> General <br /> G1 Cover Sheet <br /> G2 General Notes,Vicinity Map,List of Drawings <br /> G3 Legend and Abbreviations <br /> G4 Survey Control <br /> General Civil <br /> GC1 through GC4 General Civil Details <br /> GC5 through GC6 Cathodic Protection Details <br /> Civil <br /> Cl through C3 Pipeline Plan and Profile <br /> C4 through C5 Cathodic Protection System <br /> Miscellaneous <br /> TC1 Traffic Control Plan <br /> EC1 Erosion Control Details and Notes <br /> EC2 Erosion Control Plan <br /> 5.2 Project Manual-Prepare a project manual consisting of bidding and contract documents, <br /> standard details,technical specifications and appendices. Specifications will be prepared in <br /> CSI standard format. The Project Manual is anticipated to include the following <br /> components: <br /> Cover,Title Sheet,Vicinity Map,Notice to Contractors, Table of Contents <br /> Special Provisions <br /> Appendix A—Standard Drawings <br /> Appendix B—WA Prevailing Wages(Snohomish County) <br /> Appendix C—PSCAA Air Quality Rules <br /> Appendix D—Geotechnical Information <br /> Appendix E—Sample Change Order Form <br /> Appendix F—Construction Plans <br /> 5.3 Utility Coordination-Design development will include collaboration with utility companies <br /> that are affected by the project. Initial collaboration with utility companies will occur during <br /> the preliminary design and they will be asked to review the 50%completion plans for <br /> coordination and technical input. Coordinate meeting with utilities and distribute plans. <br /> Keep a written record of all communication with utility providers. <br /> 5.4 Constructability Reviews-Provide constructability review of the improvements and <br /> document any known issues that could affect the constructability or potential schedule of the <br /> project. <br /> Trans Line 4 Phase 1 Replacement 9 3 City of Everett <br /> April 1,2010 Page 7 WO#UP 3421 <br />
The URL can be used to link to this page
Your browser does not support the video tag.